Water, sewer and wastewater line items in Newmarket’s published capital improvement plans and adopted budgets, with budgets, years and the source documents.
- Planned budget
- $18M
- Line items
- 13
- Wastewater and sewer
- $8M
- Starting
- 2026
- Plan
- 1
Newmarket's published capital plans list 13 water, sewer and wastewater line items with a combined planning budget of $18M, of which 7 items worth $8M sit in the wastewater and sewer departments. The largest single item is New Water Tower at $4M (2026–2032). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
The largest water and sewer projects in Newmarket
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | New Water Tower | Water Distribution | Storage tanks and reservoirs | $4M | 2026–2032 |
| 2 | Pump Station Improvements | Sewer | Pump stations | $3M | 2026–2032 |
| 3 | Water Treatment Plant MacIntosh / Tucker Pg. 1 | Water Supply | Water treatment plants | $2M | 2026–2032 |
| 4 | Water Treatment Plant MacIntosh/Tucker Pg. 2 | Water Supply | Water treatment plants | $2M | 2026–2032 |
| 5 | Wastewater Facility Site Various Equipment Replacement Program | Wastewater | Wastewater treatment plant upgrades | $1M | 2026–2032 |
| 6 | Maintenance Building Equipment Replacement Program | Sewer | Buildings, HVAC and site work | $1M | 2026–2032 |
| 7 | Control Building Equipment Replacement Program | Sewer | Buildings, HVAC and site work | $667K | 2026–2032 |
| 8 | Creighton St. Pumping Station Equipment Replacement Program | Sewer | Pump stations | $612K | 2026–2032 |
| 9 | Dewatering Building Equipment Replacement Program | Sewer | Biosolids, sludge and dewatering | $604K | 2026–2032 |
| 10 | Sewall and Bennett Well Equipment Replacement Program | Water Supply | Wells and groundwater | $580K | 2026–2032 |
Planned spend by start year
By department
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 1 | $1M | 7% |
| Sewer | 6 | $7M | 38% |
| Water Supply | 4 | $6M | 31% |
| Water Distribution | 2 | $4M | 23% |
Project types in Newmarket's plan
- Water treatment plants2 line items$4M
- Pump stations2 line items$4M
- Storage tanks and reservoirs1 line items$4M
- Buildings, HVAC and site work2 line items$2M
- Wastewater treatment plant upgrades1 line items$1M
- Wells and groundwater2 line items$1M
- Biosolids, sludge and dewatering1 line items$604K
- Sewer rehabilitation and I&I1 line items$296K
Wastewater treatment plants in Newmarket
1 publicly owned treatment plant in Newmarket with 16 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Newmarket, Town Of - WPCF | 0.44 | NHG580013 | 16 |
Other New Hampshire cities with capital plans
- $138M
- $107M
- $83M
- $74M
- $66M
- $64M
- $48M
- $24M
Newmarket capital plan questions
How much is Newmarket, NH planning to spend on water and sewer infrastructure?
Newmarket’s published capital plans list 13 water, sewer and wastewater line items with a combined budget of $18M, of which $8M is in the wastewater and sewer departments.
What is the largest capital project in Newmarket’s plan?
New Water Tower, budgeted at $4M and scheduled for 2026–2032 under the Water Distribution department.
When do Newmarket’s water and sewer projects start?
13 projects ($18M) start in 2026. Budgets are as published in the plan and can change at adoption.
How do I find the contacts and full project list for Newmarket?
Klarifi holds every line item with its description, page reference and source document, plus 8 verified contacts at the city’s treatment plants. The public page shows the ten largest items; the full list is available with a free trial.
Try Klarifi for free
Create your own trial account and explore how Klarifi can help you.