10 line items · $17M · starting 2026–2029 · 1 plan
Seabrook's published capital plans list 10 water, sewer and wastewater line items with a combined planning budget of $17M, of which 4 items worth $15M sit in the wastewater and sewer departments. The largest single item is Pump Station Upgrades at $13M (2025–2029). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Pump Station Upgrades | Sewer | Pump stations | $13M | 2025–2029 |
| 2 | Wastewater Plant Climate Resiliency Project | Wastewater | Wastewater treatment plant upgrades | $2M | 2027 |
| 3 | Collection System Inflow and Infiltration Investigation and Correction | Sewer | Membranes and filtration | $700K | 2026–2029 |
| 4 | Water Filters Media Replacement | Water Supply | Membranes and filtration | $505K | 2026 |
| 5 | Water Replace/Repair Bedrock Well 4 | Water Supply | Wells and groundwater | $350K | 2028 |
| 6 | Water Well Maintenance | Water Supply | Wells and groundwater | $325K | 2025–2029 |
| 7 | Water Meter Replacement | Water Distribution | Meters and AMI | $150K | 2025–2029 |
| 8 | Sewer SCADA Maintenance | Sewer | SCADA, controls and instrumentation | $95K | 2028 |
| 9 | Water Connect Gravel Pack 1 to Generator | Water Supply | Generators, power and electrical | $75K | 2026 |
| 10 | Water Department SCADA Upgrade | Water Supply | SCADA, controls and instrumentation | $70K | 2029 |
Descriptions, page references and contacts for Seabrook
Klarifi holds every Seabrook line item with its description, the page it appears on and the source document. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$13M
3 items
2026
$1M
3 items
2027
$2M
1 items
2028
$445K
2 items
2029
$70K
1 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 1 | $2M | 9% |
| Sewer | 3 | $14M | 82% |
| Water Supply | 5 | $1M | 8% |
| Water Distribution | 1 | $150K | 1% |
No publicly owned treatment plant is recorded under Seabrook in the facility directory; the city may be served by a regional plant listed under another municipality. Browse all plants in New Hampshire.
Sources and methodology
Budgets and years are as published in Seabrook’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2024–2029 (10 line items).