Taos, New Mexico: water and wastewater capital improvement projects

15 line items · $13M · 1 plan

Taos's published capital plans list 15 water, sewer and wastewater line items with a combined planning budget of $13M, of which 11 items worth $6M sit in the wastewater and sewer departments. The largest single item is Mitigation Well at $3M (2025–2026). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Taos

The 10 largest water, sewer and wastewater line items in Taos’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1Mitigation WellWater SupplyWells and groundwater$3M2025–2026
2UNM Klauer WellWater SupplyWells and groundwater$2M2025–2026
3Land Acquisition - WWTP Retention PondWastewaterWastewater treatment plant upgrades$2M2025–2026
4WWTP RehabilitationWastewaterWastewater treatment plant upgrades$2M2025–2026
5Camino Medio Well PumpWater SupplyPump stations$1M2025–2026
6Bataan WellWater SupplyWells and groundwater$914K2025–2026
7Infrastructure - Valverde/La LomitaWastewater$619K2025–2026
8Taos Pueblo VaultWastewater$404K2025–2026
9Infrastructure - Cordoba/Destino WaterWastewater$206K2025–2026
10CDBG - TM LeverageWastewater$175K2025–2026

5 more line items in Taos, with descriptions and contacts

Klarifi holds every Taos line item with its description, the page it appears on and the source document, plus 4 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$13M

15 items

By department

Line items and planning budgets by department, Taos.
DepartmentLine itemsBudgetShare
Wastewater11$6M42%
Water Supply4$8M58%

Wastewater treatment plants in Taos

2 publicly owned treatment plants in Taos with 79 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Taos Wastewater Treatment Plant1.03NM002406656
Town Of Red River0.5NM002489923

Taos capital plan questions

Sources and methodology

Budgets and years are as published in Taos’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: Adopted Budget 2025–2026 (15 line items).

Data refreshed September 11, 2026.