Edmond, Oklahoma: water and wastewater capital improvement projects

16 line items · $72M · starting 2026–2029 · 1 plan

Edmond's published capital plans list 16 water, sewer and wastewater line items with a combined planning budget of $72M, of which 5 items worth $29M sit in the wastewater and sewer departments. The largest single item is Annual Line Replacement at $24M (2026–2030). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Edmond

The 10 largest water, sewer and wastewater line items in Edmond’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1Annual Line ReplacementWater DistributionWater treatment plants$24M2026–2030
2Sewer system construction, rehabilitation and replacement (Includes construction, easement purchases & engineering)WastewaterSewer rehabilitation and I&I$23M2026–2030
3Master Plan EngineeringWater SupplyPlanning, studies and asset management$8M2026–2030
4WTP Expansion Engineering/Inspection FeesWater SupplyWater treatment plants$6M2026
5Master Plan EngineeringWastewaterPlanning, studies and asset management$5M2026–2030
6Well ServicesWater SupplyWells and groundwater$3M2026–2030
7Well Pumps and MotorsWater SupplyPump stations$2M2026–2030
8New Meter InstallsWater DistributionMeters and AMI$1M2026–2030
9Pump ReplacementWater SupplyPump stations$500K2026–2030
10Replacement Grinder UnitsWastewaterPump stations$500K2026–2030

6 more line items in Edmond, with descriptions and contacts

Klarifi holds every Edmond line item with its description, the page it appears on and the source document, plus 4 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

2026

$72M

14 items

2029

$180K

2 items

By department

Line items and planning budgets by department, Edmond.
DepartmentLine itemsBudgetShare
Wastewater5$29M40%
Water Supply9$18M25%
Water Distribution2$25M35%

Wastewater treatment plants in Edmond

2 publicly owned treatment plants in Edmond with 41 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Edmond, City Of - Coffee Creek6.9OK002602620
Ok City Water Util Trst-Chisholm5.61OK002755321

Other Oklahoma cities with capital plans

Edmond capital plan questions

Sources and methodology

Budgets and years are as published in Edmond’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2026–2030 (16 line items).

Data refreshed September 11, 2026.