Philadelphia, Pennsylvania: water and wastewater capital improvement projects

4 line items · $5M · starting 2026 · 1 plan

Philadelphia's published capital plans list 4 water, sewer and wastewater line items with a combined planning budget of $5M. The largest single item is Improvements to Collector System at $2M (2026–2031). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Philadelphia

The 4 largest water, sewer and wastewater line items in Philadelphia’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1Improvements to Collector SystemWater Supply$2M2026–2031
2Improvements to Treatment FacilitiesWater Supply$2M2026–2031
3Improvements to Conveyance SystemWater Supply$1M2026–2031
4Engineering and Material SupportWater Supply$140K2026–2031

Descriptions, page references and contacts for Philadelphia

Klarifi holds every Philadelphia line item with its description, the page it appears on and the source document, plus 2 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

2026

$5M

4 items

By department

Line items and planning budgets by department, Philadelphia.
DepartmentLine itemsBudgetShare
Water Supply4$5M100%

Wastewater treatment plants in Philadelphia

1 publicly owned treatment plant in Philadelphia with 1 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Phila Water Dept - SE STP77PAL0266621

Philadelphia capital plan questions

Sources and methodology

Budgets and years are as published in Philadelphia’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2025–2029 (4 line items).

Data refreshed September 11, 2026.