2018 Three Elms Park Road, Independence, IA 50644 · Buchanan County · Publicly Owned Treatment Works
Independence WWTP is a publicly owned wastewater treatment works in Independence, Buchanan County, Iowa treating an average of 1.31 million gallons per day against a permitted design capacity of 7.8 MGD, serving about 6,236 residents. It discharges under NPDES permit IA0036510 (administratively continued), which expires in September 2025, with 8 recorded violations in the last three years.
2 treatment structures and unit processes identified at Independence WWTP.
Available with a free Klarifi account
See the full treatment train at Independence WWTP: structures, unit processes and planned upgrades, with exact unit counts.
Based on NPDES Discharge Monitoring Reports. Full violation history, parameters and discharge data available in the Klarifi platform.
Industries that discharge process wastewater to Independence WWTP, from the plant's pretreatment programme records.
On record: Geater Machining And Manufacturing (Independence); Wapsie Valley Creamery Back Up Generator (Independence). Most users are in automotive, metal and equipment manufacturing and food and beverage.
Unlock the details behind these industrial users
Discharge flow, federal category, source documents and contacts for every industrial user of Independence WWTP. Free with a Klarifi account.
Independence's capital improvement plan lists 15 water, sewer and wastewater line items worth $1M starting 2025–2027. The largest budgeted items are shown here.
All water and sewer capital projects in Independence →
| Project | Budget | Years |
|---|---|---|
| Install Biogas Cleaning System | $300,000 | 2026–2026 |
| New Dual Fuel Boiler | $275,000 | 2027–2027 |
| Replacement Large Pump | $150,000 | 2025–2025 |
| Replace Blowers and Aeration Equipment | $130,000 | 2026–2026 |
| Replace Non-Metallic Chains | $100,000 | 2025–2026 |
Full project details — scope, funding source, engineering consultant and the decision-makers behind each project — are available in Klarifi, along with similar wastewater capital projects in other cities.
8 verified contacts for Independence WWTP, with validated emails and direct phone numbers.
Unlock 8 verified contacts (5 more than shown)
Names, validated emails and direct phone numbers for decision-makers at Independence WWTP, plus the full compliance history and discharge data.
Rowley · 6 mi away
—
Winthrop · 7 mi away
0.23 MGD
Quasqueton · 8 mi away
0.03 MGD
Jesup · 10 mi away
0.2 MGD
Hazleton · 11 mi away
0.13 MGD
Brandon · 12 mi away
0.03 MGD
Aurora · 13 mi away
—
Walker · 13 mi away
0.11 MGD
Sources and methodology
Flow, permit and violation figures come from the EPA's ICIS-NPDES discharge monitoring records. Population served comes from the Clean Watersheds Needs Survey 2022. Treatment structures are identified by Klarifi's review of aerial imagery, and capital improvement projects are extracted from published municipal budget documents. Violations are counted over the last three years of monitoring reports.
Data refreshed October 26, 2026; facility record last updated March 28, 2025.
Wastewater terms: POTW · MGD · NPDES permit · Inflow and infiltration · Anaerobic digester · Lift station · all terms