Back River Wastewater Treatment Plant
8201 Eastern Ave, Baltimore, MD 21224 · Baltimore City County · Publicly Owned Treatment Works
- Average flow
- 108.64 MGD
- Design flow
- —
- Permit expires
- December 2030
- Population served
- 432,114
Back River Wastewater Treatment Plant is a publicly owned wastewater treatment works in Baltimore, Baltimore City County, Maryland treating an average of 108.64 million gallons per day, serving about 432,114 residents. It discharges under NPDES permit MDL021555 (effective), which expires in December 2030, with 32 recorded violations in the last three years. EPA has recorded 2 formal enforcement actions naming the plant, the latest in October 2017.
Treatment technology
4 treatment structures and unit processes identified at Back River Wastewater Treatment Plant.
Compliance snapshot (last 3 years)
Based on NPDES Discharge Monitoring Reports. Full violation history, parameters and discharge data available in the Klarifi platform.
- Total violations
- 32
- Effluent violations
- 10
EPA enforcement history
Federal civil enforcement cases, compliance inspections and informal actions recorded for Back River Wastewater Treatment Plant in EPA's ICIS system.
- Formal actions
- 2
- Penalties assessed
- $604,832
- Compliance actions
- $2,584M
- EPA inspections
- 1
Latest case
Judicial case · CWA, NPDES Permit Violations · Final Order With Penalty · Penalty $600,000 · Compliance actions $2,584M · The case also names 1 other plant, and its amounts cover all of them
Capital improvement projects in Baltimore
Baltimore's capital improvement plan lists 212 water, sewer and wastewater line items worth $4.7B starting 2025–2031. The largest budgeted items are shown here.
| Project | Budget | Years |
|---|---|---|
| Future Water Main Replacement | $280,000,000 | 2027–2031 |
| Baltimore St./Smallwood St./Reisterstown Rd. Area Water Main Replacements | $199,868,000 | 2026–2030 |
| OF Hyd Outfall Phase II Sewershed Improvements for 5 Year Storm LOP | $155,083,680 | 2027–2029 |
| (Project 1355) Activated Plant 3 Rehab at BRWWTP | $122,148,822 | 2027–2027 |
| Construction Reserve Meter Replacement | $110,000,000 | 2026–2031 |
Key contacts
9 verified contacts for Back River Wastewater Treatment Plant, with validated emails and direct phone numbers.
Nearby wastewater treatment plants in Maryland
- Patapsco Wastewater Treatment PlantBaltimore · 6 mi away50.57 MGD
- Richlyn Manor WWTPPerry Hall · 9 mi away0.02 MGD
- Glen Arm Wastewater Treatment Plant (formerly Grumman Wwtp)Glen Arm · 11 mi away—
- Tolchester WWTPChestertown · 16 mi away0.05 MGD
- Rock Hall WWTPRock Hall · 17 mi away0.21 MGD
- Sod Run Wastewater Treatment PlantPerryman · 17 mi away9.67 MGD
- Broadneck Water Reclamation FacilityAnnapolis · 19 mi away3.8 MGD
- Piney Orchard WWTPOdenton · 20 mi away—
Back River Wastewater Treatment Plant: frequently asked questions
What is the address of Back River Wastewater Treatment Plant?
The address on the plant’s EPA facility record is 8201 Eastern Ave, Baltimore, MD 21224, in Baltimore City County. Its coordinates are 39.2929, -76.4929. For some plants the record holds the utility’s mailing address rather than the plant gate.
How much wastewater does Back River Wastewater Treatment Plant treat?
Back River Wastewater Treatment Plant treats an average of 108.64 MGD.
Has Back River Wastewater Treatment Plant been subject to EPA enforcement action?
EPA's enforcement records list 2 formal civil enforcement cases naming Back River Wastewater Treatment Plant, 0 since fiscal year 2020. The latest case reached its current status in October 2017 (judicial case, final order with penalty). Penalties assessed across the cases total $604,832. The full case history, with milestones, violation types and EPA's case summaries, is shown in Klarifi with a free account.
What treatment technology does Back River Wastewater Treatment Plant use?
Klarifi has identified 4 treatment structures and unit processes at the Baltimore facility. The full treatment train, with exact unit counts, is shown in Klarifi with a free account.
What is the NPDES permit for Back River Wastewater Treatment Plant?
The facility discharges under NPDES permit MDL021555, currently effective, expiring December 2030.
Is Back River Wastewater Treatment Plant in compliance?
Discharge monitoring reports show 32 violations at Back River Wastewater Treatment Plant in the last three years, 10 of them effluent limit exceedances. The full history is available in Klarifi.
Are there capital improvement projects planned in Baltimore, MD?
Yes. Baltimore's capital improvement plan lists 212 water, sewer and wastewater projects worth $4.7B starting between 2025 and 2031. Line items and the people behind them are in Klarifi.
Who operates Back River Wastewater Treatment Plant and how do I contact them?
Back River Wastewater Treatment Plant is a publicly owned treatment works in Baltimore, Maryland. Klarifi lists 9 verified decision-maker contacts for this facility, available with a free trial.