36 plants · 42% of the state · 25 MGD reported by 17 plants
Klarifi identifies 36 publicly owned wastewater treatment plants with oxidation ditches in North Carolina, 42% of the 85 plants in the state (25 MGD reported by 17 plants). The largest is Town Of Cary - North Cary WWTP in Cary at 5.91 MGD.
Oxidation ditches are ring-shaped activated sludge reactors with long retention times, common at plants between 0.5 and 10 MGD. They are recognisable from the air by their looped channels and rely on surface aerators or brush rotors, which are frequent replacement and energy-efficiency projects.
| # | Facility | City | Avg flow (MGD) | NPDES permit | Expires | Violations (3y) |
|---|---|---|---|---|---|---|
| 1 | Town Of Cary - North Cary WWTP | Cary | 5.91 | NC0048879 | Feb 2028 | 0 |
| 2 | New Bern Waste Water Treatment Plant | New Bern | 4.91 | NC0025348 | Jun 2027 | 0 |
| 3 | Triangle WWTP | Durham | 4.35 | NC0026051 | Apr 2027 | 3 |
| 4 | Siler City WWTP | Siler City | 2.1 | NC0026441 | May 2027 | 21 |
| 5 | Contentnea Metropolitan Sewerage District | Grifton | 1.44 | NC0032077 | Nov 2025 | 0 |
| 6 | Sgwasa WWTP | Butner | 1.36 | NC0026824 | Oct 2030 | 0 |
| 7 | Sam'S Branch WRF | Clayton | 1.23 | NC0025453 | Mar 2030 | 4 |
| 8 | Oxford WWTP | Oxford | 0.99 | NC0025054 | Sep 2030 | 2 |
| 9 | Little Creek Resource Recovery Facility | Zebulon | 0.92 | NC0079316 | May 2030 | 2 |
| 10 | Newport WWTP | Newport | 0.36 | NC0021555 | Jul 2030 | 0 |
| 11 | Kenly Waste Water Treatment Plant | Kenly | 0.25 | NC0064891 | Apr 2023 | 0 |
| 12 | Town Of Snow Hill | Snow Hill | 0.24 | NC0020842 | May 2028 | 3 |
| 13 | Pinetops WWTP | Pinetops | 0.15 | NC0020435 | Sep 2029 | 26 |
| 14 | Maury Sanitary Land District WWTP | Maury | 0.14 | NC0061492 | May 2028 | 25 |
| 15 | Vanceboro WWTP | Vanceboro | 0.13 | NC0031828 | Apr 2028 | 55 |
| 16 | Robersonville WWTP | Robersonville | 0.12 | NC0026042 | Nov 2028 | 71 |
| 17 | Town Of Stantonsburg | Stantonsburg | 0.06 | NC0057606 | May 2028 | 3 |
| 18 | Apex Water Reclamation Facility | Apex | — | NC0064050 | Apr 2026 | 2 |
| 19 | Badin WWTP | Badin | — | NC0074756 | Jul 2029 | 3 |
| 20 | Beaufort WWTP | Beaufort | — | NC0021831 | Jul 2029 | 4 |
| 21 | Carolina Beach WWTP | Carolina Beach | — | NC0023256 | Mar 2026 | 1 |
| 22 | Hertford WWTP | Hertford | — | NC0021849 | Dec 2027 | 17 |
| 23 | Holly Springs WWTP | Holly Springs | — | NC0063096 | Jul 2028 | 1 |
| 24 | Kenansville WWTP | Kenansville | — | NC0036668 | Jan 2027 | 0 |
| 25 | Lincolnton WWTP | Lincolnton | — | NC0025496 | Jul 2026 | 3 |
Contacts and project signals for every plant on this list
Klarifi adds verified decision-maker contacts, permit limits, discharge monitoring data and the capital projects planned in each city, filterable by technology, size and compliance record.
Sources and methodology
Flow, permit and violation figures come from the EPA's ICIS-NPDES discharge monitoring records. Population served comes from the Clean Watersheds Needs Survey 2022. Treatment structures are identified by Klarifi's review of aerial imagery, and capital improvement projects are extracted from published municipal budget documents. Violations are counted over the last three years of monitoring reports.
Data refreshed September 11, 2026.