8 line items · $107M · starting 2026–2028 · 1 plan
Huntsville's published capital plans list 8 water, sewer and wastewater line items with a combined planning budget of $107M, of which 8 items worth $107M sit in the wastewater and sewer departments. The largest single item is CMOM Sanitary Sewer Rehabilitation Projects for Large Diameter Gravity Sewer and Creek Bank Restoration at $21M (2025–2029). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | CMOM Sanitary Sewer Rehabilitation Projects for Large Diameter Gravity Sewer and Creek Bank Restoration | Sewer | Sewer rehabilitation and I&I | $21M | 2025–2029 |
| 2 | Spring Branch WWTP Improvements | Wastewater | Wastewater treatment plant upgrades | $20M | 2027–2028 |
| 3 | Redstone Arsenal WWTP Acquisition | Wastewater | Wastewater treatment plant upgrades | $15M | 2026 |
| 4 | Sanitary Sewer Rehabilitation | Sewer | Sewer rehabilitation and I&I | $14M | 2027–2029 |
| 5 | WPC System Wide Pump Station Rehabilitation Projects Supporting Regulatory Compliance | Sewer | Pump stations | $13M | 2025–2029 |
| 6 | Aldridge Creek WWTP Improvements | Wastewater | Wastewater treatment plant upgrades | $10M | 2028 |
| 7 | Big Cove WWTP Improvements | Wastewater | Wastewater treatment plant upgrades | $10M | 2027 |
| 8 | 565 Forcemain Project | Sewer | Force mains and interceptors | $5M | 2025 |
Descriptions, page references and contacts for Huntsville
Klarifi holds every Huntsville line item with its description, the page it appears on and the source document, plus 4 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$39M
3 items
2026
$15M
1 items
2027
$44M
3 items
2028
$10M
1 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 4 | $55M | 51% |
| Sewer | 4 | $52M | 49% |
3 publicly owned treatment plants in Huntsville with 1 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Aldridge Creek Wastewater Treatment Plant | 4.06 | AL0056855 | 0 |
| Stoney Creek WWTP | 0.02 | AL0066796 | 1 |
| Central School Lagoon | 0.0028 | AL0048810 | 0 |
Sources and methodology
Budgets and years are as published in Huntsville’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: Adopted Budget 2025 (8 line items).
Data refreshed September 11, 2026.