31 line items · $307M · starting 2026–2029 · 1 plan
Buckeye's published capital plans list 31 water, sewer and wastewater line items with a combined planning budget of $307M, of which 11 items worth $130M sit in the wastewater and sewer departments. The largest single item is Bartlet Dam at $60M (2027–2029). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Bartlet Dam | Water Supply | — | $60M | 2027–2029 |
| 2 | Farallon Water Campus 16 | Water Distribution | Water mains and distribution | $47M | 2025 |
| 3 | Central WWTP 1.5 MGD Expansion | Wastewater | Wastewater treatment plant upgrades | $39M | 2025–2027 |
| 4 | Reclaimed Water from Central WRD to RID SF | Wastewater | Water reuse and reclaimed water | $19M | 2025–2029 |
| 5 | Sundance WRF Improvements | Wastewater | Wastewater treatment plant upgrades | $19M | 2025–2027 |
| 6 | WR Department Field Operations Center | Wastewater | SCADA, controls and instrumentation | $18M | 2025–2027 |
| 7 | Central WWTP Ring Levee Project | Wastewater | Wastewater treatment plant upgrades | $16M | 2025–2027 |
| 8 | Central WRF Improvements Phase 3 | Wastewater | Wastewater treatment plant upgrades | $12M | 2025–2027 |
| 9 | Valencia System Water Mains Upgrade | Water Distribution | Water mains and distribution | $12M | 2025–2028 |
| 10 | North Airport Water Campus - Fluoride removal | Water Supply | — | $9M | 2026–2027 |
21 more line items in Buckeye, with descriptions and contacts
Klarifi holds every Buckeye line item with its description, the page it appears on and the source document, plus 4 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$232M
25 items
2026
$13M
3 items
2027
$60M
1 items
2029
$3M
2 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 11 | $130M | 42% |
| Water Supply | 13 | $105M | 34% |
| Water Distribution | 7 | $72M | 23% |
3 publicly owned treatment plants in Buckeye with 41 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Town Of Buckeye - Sundance Wwrf | 2.02 | AZ0024881 | 37 |
| Buckeye WWTP | 1.38 | AZ0025313 | 1 |
| Festival Ranch WRF | 0.28 | AZ0025216 | 3 |
Sources and methodology
Budgets and years are as published in Buckeye’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2025–2029 (31 line items).
Data refreshed September 11, 2026.