Buckeye, Arizona: water and wastewater capital improvement projects

31 line items · $307M · starting 2026–2029 · 1 plan

Buckeye's published capital plans list 31 water, sewer and wastewater line items with a combined planning budget of $307M, of which 11 items worth $130M sit in the wastewater and sewer departments. The largest single item is Bartlet Dam at $60M (2027–2029). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Buckeye

The 10 largest water, sewer and wastewater line items in Buckeye’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1Bartlet DamWater Supply$60M2027–2029
2Farallon Water Campus 16Water DistributionWater mains and distribution$47M2025
3Central WWTP 1.5 MGD ExpansionWastewaterWastewater treatment plant upgrades$39M2025–2027
4Reclaimed Water from Central WRD to RID SFWastewaterWater reuse and reclaimed water$19M2025–2029
5Sundance WRF ImprovementsWastewaterWastewater treatment plant upgrades$19M2025–2027
6WR Department Field Operations CenterWastewaterSCADA, controls and instrumentation$18M2025–2027
7Central WWTP Ring Levee ProjectWastewaterWastewater treatment plant upgrades$16M2025–2027
8Central WRF Improvements Phase 3WastewaterWastewater treatment plant upgrades$12M2025–2027
9Valencia System Water Mains UpgradeWater DistributionWater mains and distribution$12M2025–2028
10North Airport Water Campus - Fluoride removalWater Supply$9M2026–2027

21 more line items in Buckeye, with descriptions and contacts

Klarifi holds every Buckeye line item with its description, the page it appears on and the source document, plus 4 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$232M

25 items

2026

$13M

3 items

2027

$60M

1 items

2029

$3M

2 items

By department

Line items and planning budgets by department, Buckeye.
DepartmentLine itemsBudgetShare
Wastewater11$130M42%
Water Supply13$105M34%
Water Distribution7$72M23%

Project types in Buckeye's plan

Wastewater treatment plants in Buckeye

3 publicly owned treatment plants in Buckeye with 41 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Town Of Buckeye - Sundance Wwrf2.02AZ002488137
Buckeye WWTP1.38AZ00253131
Festival Ranch WRF0.28AZ00252163

Other Arizona cities with capital plans

Buckeye capital plan questions

Sources and methodology

Budgets and years are as published in Buckeye’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2025–2029 (31 line items).

Data refreshed September 11, 2026.