3,064 planned projects · $17.6B · 423 cities in 44 states
Water main replacement and extension, transmission mains, valves, hydrants and distribution-system programs, the largest line-item category by count in most water utility budgets.
Klarifi's extraction of published capital improvement plans finds 3,064 water main projects in 423 cities with a combined planning budget of $17.6B, the largest being Water Distribution Projects in Nashville, TN at $667M. The list below ranks the 25 largest by budget; every city links to its full capital plan page.
| # | Project | City | Budget | Years |
|---|---|---|---|---|
| 1 | Water Distribution Projects | Nashville, TN | $667M | 2025–2030 |
| 2 | Major Mains Bucket | Fort Worth, TX | $452M | 2025–2029 |
| 3 | Bull Run Pipelines | Portland, OR | $302M | 2025–2029 |
| 4 | Future Water Main Replacement | Baltimore, MD | $280M | 2027–2031 |
| 5 | ACP Water Line Replacements | Gilbert, AZ | $274M | 2027–2034 |
| 6 | Central Mesa Reuse Pipeline Project | Mesa, AZ | $222M | 2023–2029 |
| 7 | Watermain Rehabilitation | Seattle, WA | $210M | 2025–2030 |
| 8 | Baltimore St./Smallwood St./Reisterstown Rd. Area Water Main Replacements | Baltimore, MD | $200M | 2026–2030 |
| 9 | Bull Run Pipelines | Portland, OR | $179M | 2024–2027 |
| 10 | Raw Water 2nd Atoka Pipeline - Lake Atoka to Lake Stanley Draper (Citywide) | Oklahoma City, OK | $175M | 2026 |
| 11 | Water Line Rehabilitation Program – Epoxy, Burst, Dig & Lay | Greensboro, NC | $168M | 2025–2035 |
| 12 | Galvanized Pipe Replacement - Program | Jacksonville, FL | $165M | 2024–2028 |
| 13 | Infrastructure - Water Mains and Meters | Lincoln, NE | $165M | 2025–2030 |
| 14 | Water Utility Distribution System Improvements | Richmond, VA | $162M | 2026–2030 |
| 15 | RP FY24-26 Main Replacement | Raleigh, NC | $162M | 2024–2029 |
| 16 | City-Wide Water Line Repair/Replacement - Large Diameter | Corpus Christi, TX | $160M | 2025–2034 |
| 17 | City-Wide Water Line Repair/Replacement - Small Diameter | Corpus Christi, TX | $160M | 2025–2034 |
| 18 | Surface Water Transmission Program | Houston, TX | $133M | 2025 |
| 19 | Water Supply/Transmission/Storage | Tacoma, WA | $126M | 2025–2030 |
| 20 | 2026 - 2030 Water Main Replacement Program | Topeka, KS | $126M | 2025–2031 |
| 21 | Water Distribution System Improvements | Richmond, VA | $120M | 2025–2029 |
| 22 | Distribution | Seattle, WA | $119M | 2025–2026 |
| 23 | Waterlines | Chesterfield, VA | $118M | 2026–2030 |
| 24 | Distribution Mains | Portland, OR | $113M | 2025–2030 |
| 25 | Water Main Replacement Program | Santa Barbara, CA | $111M | 2025–2031 |
All 3,064 water main projects, with descriptions and contacts
Every line item with its description, page reference and source document, filterable by state, budget and start year, linked to the treatment plants and decision-makers in each city, and refreshed as new plans are adopted.
| City | Projects | Budget |
|---|---|---|
| Phoenix, AZ | 109 | $913M |
| Ann Arbor, MI | 68 | $169M |
| Mason, MI | 64 | $9M |
| Portland, OR | 53 | $840M |
| Kalamazoo, MI | 53 | $165M |
| Myakka City, FL | 51 | $324M |
| Spokane, WA | 48 | $61M |
| Baltimore, MD | 44 | $986M |
| Gilbert, AZ | 36 | $630M |
| Greensboro, NC | 36 | $331M |
| Juneau, AK | 33 | $86M |
| Fort Lauderdale, FL | 30 | $83M |
| State | Projects | Budget |
|---|---|---|
| Michigan | 690 | $1.0B |
| Florida | 204 | $1.3B |
| Washington | 196 | $1.2B |
| California | 191 | $1.0B |
| Arizona | 160 | $2.0B |
| Texas | 149 | $2.1B |
| Oregon | 143 | $998M |
| Ohio | 124 | $263M |
| Illinois | 120 | $399M |
| Colorado | 90 | $344M |
| North Carolina | 88 | $640M |
| Minnesota | 79 | $206M |
Before 2026
$11.1B
1,354 items
2026
$3.0B
616 items
2027
$1.6B
394 items
2028
$669M
259 items
2029
$664M
243 items
2030
$428M
116 items
2031
$64M
38 items
2032 and later
$155M
43 items
Unscheduled
$8M
1 items
Sources and methodology
Budgets and years are as published in each city’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Data refreshed September 11, 2026.