Mason, Michigan: water and wastewater capital improvement projects

113 line items · $17M · starting 2026–2029 · 2 plans

Mason's published capital plans list 113 water, sewer and wastewater line items with a combined planning budget of $17M, of which 14 items worth $920K sit in the wastewater and sewer departments. The largest single item is Advanced Metering Infrastructure and Meter Replacement (Water) at $1M (2028–2029). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Mason

The 10 largest water, sewer and wastewater line items in Mason’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1Advanced Metering Infrastructure and Meter Replacement (Water)Water DistributionMeters and AMI$1M2028–2029
2Advanced Metering Infrastructure and Meter Replacement (Water)Water SupplyMeters and AMI$1M2028–2029
3W. South Street: Lansing Street to US 127 (Gen Utilities)Water DistributionWater mains and distribution$501K2028–2029
4W. South Street: Lansing Street to US 127 (Gen Utilities)Water DistributionWater mains and distribution$501K2028–2029
5Office Building Remodel (Sanitary)Water DistributionSewer rehabilitation and I&I$500K2029–2030
6Office Building Remodel (Sanitary)Water SupplySewer rehabilitation and I&I$500K2029–2030
7Supervisory Control and Data Acquisition (Water)Water Supply$500K2026–2027
8Supervisory Control and Data Acquisition (Water)Water Distribution$500K2026–2027
9N. Water Tower Repairs (Water)Water SupplyStorage tanks and reservoirs$400K2025–2026
10N. Water Tower Repairs (Water)Water DistributionStorage tanks and reservoirs$400K2025–2026

103 more line items in Mason, with descriptions and contacts

Klarifi holds every Mason line item with its description, the page it appears on and the source document, plus 1 verified contact at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$4M

35 items

2026

$3M

22 items

2027

$2M

19 items

2028

$5M

16 items

2029

$2M

21 items

By department

Line items and planning budgets by department, Mason.
DepartmentLine itemsBudgetShare
Wastewater5$185K1%
Sewer9$735K4%
Water Supply24$4M24%
Water Distribution75$12M70%

Wastewater treatment plants in Mason

1 publicly owned treatment plant in Mason with 31 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Mason WWTP0.84MI002043531

Other Michigan cities with capital plans

Mason capital plan questions

Sources and methodology

Budgets and years are as published in Mason’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2024–2030 (58 line items); CIP 2022–2028 (55 line items).

Data refreshed September 11, 2026.

Try Klarifi for free

Create your own trial account and explore how Klarifi can help you.

Try for free