Ann Arbor, Michigan: water and wastewater capital improvement projects

151 line items · $503M · starting 2026–2031 · 1 plan

Ann Arbor's published capital plans list 151 water, sewer and wastewater line items with a combined planning budget of $503M, of which 53 items worth $111M sit in the wastewater and sewer departments. The largest single item is WTP: Plant 1 Replacement Project at $142M (2025–2031). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Ann Arbor

The 10 largest water, sewer and wastewater line items in Ann Arbor’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1WTP: Plant 1 Replacement ProjectWater SupplyWater treatment plants$142M2025–2031
2High Level Trunkline Sewer Capacity ImprovementsSewerSewer rehabilitation and I&I$21M2025–2027
3Dams: Barton Dam Embankment RehabilitationWater Distribution$13M2025–2027
4WTP: Plant 2 ReadinessWater SupplyWater treatment plants$9M2028–2030
5Galvanized Water Services ReplacementsWater Distribution$9M2025–2029
6Dams: Barton Dam Concrete Repairs - Phase IIWater Distribution$9M2025–2030
7Pittsfield Village Water Main ImprovementsWater DistributionWater mains and distribution$8M2025–2027
8Dams: Barton Dam Gate ReplacementWater Distribution$8M2025–2032
9WRRF: Access Bridge ReplacementWastewaterWastewater treatment plant upgrades$8M2025–2029
10Bunker Hill, Georgetown, Prairie, Sheffield, Aurora Water Main ReplacementWater DistributionWater mains and distribution$6M2027–2029

141 more line items in Ann Arbor, with descriptions and contacts

Klarifi holds every Ann Arbor line item with its description, the page it appears on and the source document, plus 36 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$310M

52 items

2026

$32M

23 items

2027

$59M

28 items

2028

$45M

19 items

2029

$32M

15 items

2030

$14M

6 items

2031

$6M

4 items

2032 and later

$5M

4 items

By department

Line items and planning budgets by department, Ann Arbor.
DepartmentLine itemsBudgetShare
Wastewater11$24M5%
Sewer42$87M17%
Water Supply15$171M34%
Water Distribution83$221M44%

Project types in Ann Arbor's plan

Wastewater treatment plants in Ann Arbor

1 publicly owned treatment plant in Ann Arbor with 9 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Ann Arbor WWTP13.6MI00222179

Other Michigan cities with capital plans

Ann Arbor capital plan questions

Sources and methodology

Budgets and years are as published in Ann Arbor’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2026–2031 (151 line items).

Data refreshed September 11, 2026.