16 line items · $88M · starting 2026–2029 · 1 plan
Grand Ledge's published capital plans list 16 water, sewer and wastewater line items with a combined planning budget of $88M, of which 8 items worth $78M sit in the wastewater and sewer departments. The largest single item is Wastewater Treatment Plant Expansion at $55M (2025). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Wastewater Treatment Plant Expansion | Wastewater | Wastewater treatment plant upgrades | $55M | 2025 |
| 2 | Iron Removal Plant Replacement | Sewer | — | $20M | 2025 |
| 3 | Raw Water Main | Water Distribution | Water mains and distribution | $4M | 2025 |
| 4 | Watermain ‐River Crossing | Water Distribution | Water mains and distribution | $3M | 2027 |
| 5 | Inflow and Infiltration Reduction | Sewer | Membranes and filtration | $941K | 2025–2026 |
| 6 | Well Development | Water Supply | Wells and groundwater | $600K | 2025 |
| 7 | Union Street Phase I – Reconstruction | Water Distribution | Sewer rehabilitation and I&I | $570K | 2026 |
| 8 | Union Street Phase II ‐ Reconstruction | Water Distribution | Water mains and distribution | $550K | 2029 |
| 9 | Spring Street – Reconstruction | Water Distribution | Water mains and distribution | $530K | 2028 |
| 10 | Union Street Phase I – Reconstruction | Sewer | Sewer rehabilitation and I&I | $510K | 2026 |
6 more line items in Grand Ledge, with descriptions and contacts
Klarifi holds every Grand Ledge line item with its description, the page it appears on and the source document, plus 10 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$81M
6 items
2026
$1M
3 items
2027
$4M
3 items
2028
$828K
2 items
2029
$900K
2 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 1 | $55M | 62% |
| Sewer | 7 | $23M | 26% |
| Water Supply | 2 | $780K | 1% |
| Water Distribution | 6 | $9M | 11% |
1 publicly owned treatment plant in Grand Ledge with 37 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Grand Ledge WWTP | 0.77 | MI0020800 | 37 |
Sources and methodology
Budgets and years are as published in Grand Ledge’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2025–2029 (16 line items).
Data refreshed September 11, 2026.