Battle Creek, Michigan: water and wastewater capital improvement projects

31 line items · $203M · starting 2026–2029 · 2 plans

Battle Creek's published capital plans list 31 water, sewer and wastewater line items with a combined planning budget of $203M, of which 14 items worth $68M sit in the wastewater and sewer departments. The largest single item is Water Main & Trans. Line Replacement ‐ Street Program at $45M (2025–2031). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Battle Creek

The 10 largest water, sewer and wastewater line items in Battle Creek’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1Water Main & Trans. Line Replacement ‐ Street ProgramWater DistributionWater mains and distribution$45M2025–2031
2Nano Filtration Addition at the RIM Plant and additional well field reserve developmentWater SupplyMembranes and filtration$40M2024–2027
3Water Main & Trans. Line Replacement ‐ Street ProgramWater DistributionWater mains and distribution$18M2024–2030
4Nano Filtration Addition at the RIM Plant and additional well field reserve development; $10MM bond; $15MM Loan from State;$25MM Loan from StateWater SupplyMembranes and filtration$15M2025–2031
5Lift Station ReplacementWastewaterLift stations$10M2025–2029
6Solids Handling ImprovementsWastewaterBiosolids, sludge and dewatering$9M2024–2030
7Lift Station ReplacementWastewaterLift stations$8M2026–2029
8Interceptor Rehabilitation ProjectWastewaterForce mains and interceptors$6M2025–2031
9Liquid Chlorine DisinfectionWastewaterDisinfection and UV$6M2029–2031
10Solids Handling ImprovementsWastewaterBiosolids, sludge and dewatering$5M2025–2031

21 more line items in Battle Creek, with descriptions and contacts

Klarifi holds every Battle Creek line item with its description, the page it appears on and the source document, plus 19 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$181M

26 items

2026

$8M

1 items

2027

$6M

2 items

2029

$10M

2 items

By department

Line items and planning budgets by department, Battle Creek.
DepartmentLine itemsBudgetShare
Wastewater13$63M31%
Sewer1$5M2%
Water Supply12$68M33%
Water Distribution5$68M33%

Project types in Battle Creek's plan

Wastewater treatment plants in Battle Creek

1 publicly owned treatment plant in Battle Creek with 9 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Battle Creek WWTP7.55MI00222769

Other Michigan cities with capital plans

Battle Creek capital plan questions

Sources and methodology

Budgets and years are as published in Battle Creek’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2026–2031 (15 line items); CIP 2025–2030 (16 line items).

Data refreshed September 11, 2026.