Saginaw, Michigan: water and wastewater capital improvement projects

109 line items · $191M · starting 2026–2030 · 2 plans

Saginaw's published capital plans list 109 water, sewer and wastewater line items with a combined planning budget of $191M, of which 57 items worth $72M sit in the wastewater and sewer departments. The largest single item is Elevated Storage Tank at $21M (2025–2026). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Saginaw

The 10 largest water, sewer and wastewater line items in Saginaw’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1Elevated Storage TankWater SupplyStorage tanks and reservoirs$21M2025–2026
2River CrossingWastewater$20M2025
3Water Plant Switch Gear UpgradeWater SupplyWater treatment plants$13M2026–2028
4Equalization BasinsWastewater$12M2029
5Line, Rehab and Replace Water MainWater DistributionWater mains and distribution$9M2025–2030
6Lead Water Service Line ReplacementsWater DistributionWater mains and distribution$9M2025–2030
7High Service UpgradesWastewater$7M2025–2027
8Lead Service Line Replacements Main to MeterWater DistributionLead service line replacement$7M2025–2028
9East West Transmission Loop ImprovementsWater DistributionWater mains and distribution$7M2025
10Hancock RTB RenovationsWastewater$7M2025

99 more line items in Saginaw, with descriptions and contacts

Klarifi holds every Saginaw line item with its description, the page it appears on and the source document, plus 38 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$148M

78 items

2026

$19M

12 items

2027

$4M

6 items

2028

$8M

8 items

2029

$12M

3 items

2030

$500K

2 items

By department

Line items and planning budgets by department, Saginaw.
DepartmentLine itemsBudgetShare
Wastewater57$72M38%
Water Supply41$70M37%
Water Distribution11$49M26%

Project types in Saginaw's plan

Wastewater treatment plants in Saginaw

3 publicly owned treatment plants in Saginaw with 88 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
City Of Saginaw Wastewater Treatment Plant13.41MI002557721
Saginaw Twp WWTP3.24MI002397310
Buena Vista Twp WWTP0.79MI002249757

Other Michigan cities with capital plans

Saginaw capital plan questions

Sources and methodology

Budgets and years are as published in Saginaw’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2025–2030 (67 line items); CIP 2023–2028 (42 line items).

Data refreshed September 11, 2026.