2406 Veterans Memorial Parkway, Saginaw, MI 48601 · Saginaw County · Publicly Owned Treatment Works
City Of Saginaw Wastewater Treatment Plant is a publicly owned wastewater treatment works in Saginaw, Saginaw County, Michigan treating an average of 34.99 million gallons per day, serving about 69,116 residents. It discharges under NPDES permit MI0025577 (effective), which expires in October 2029, with 21 recorded violations in the last three years. EPA has recorded 2 formal enforcement actions naming the plant, the latest in October 2010.
2 treatment structures and unit processes identified at City Of Saginaw Wastewater Treatment Plant.
Available with a free Klarifi account
See the full treatment train at City Of Saginaw Wastewater Treatment Plant: structures, unit processes and planned upgrades, with exact unit counts.
Based on NPDES Discharge Monitoring Reports. Full violation history, parameters and discharge data available in the Klarifi platform.
Federal civil enforcement cases, compliance inspections and informal actions recorded for City Of Saginaw Wastewater Treatment Plant in EPA's ICIS system.
Latest case · Oct 2010
City of Saginaw WWTP - ESA
Administrative order · CAA, Prevention of Accidental Release/Risk Management Plans (RMPs) · Final Order With Penalty · Penalty $2,100
EPA's description of the case:
“This enforcement action was filed for violations to CAA 112(r)(7)(Risk Management Plan) which were discovered during an inspection which was conducted on 7/14/2009.”
Source: EPA ECHO, civil enforcement case 05-2011-7018.
Full case history with a free Klarifi account
Every action against City Of Saginaw Wastewater Treatment Plant with dates, milestones, violation types and EPA's complete case summaries, plus inspections and informal actions.
Saginaw's capital improvement plan lists 109 water, sewer and wastewater line items worth $191M starting 2025–2030. The largest budgeted items are shown here.
All water and sewer capital projects in Saginaw →
| Project | Budget | Years |
|---|---|---|
| Elevated Storage Tank | $21,000,000 | 2025–2026 |
| River Crossing | $20,200,000 | 2025–2025 |
| Water Plant Switch Gear Upgrade | $12,700,000 | 2026–2028 |
| Equalization Basins | $12,000,000 | 2029–2029 |
| Line, Rehab and Replace Water Main | $9,350,000 | 2025–2030 |
Full project details — scope, funding source, engineering consultant and the decision-makers behind each project — are available in Klarifi, along with similar wastewater capital projects in other cities.
11 verified contacts for City Of Saginaw Wastewater Treatment Plant, with validated emails and direct phone numbers.
Unlock 11 verified contacts (8 more than shown)
Names, validated emails and direct phone numbers for decision-makers at City Of Saginaw Wastewater Treatment Plant, plus the full compliance history and discharge data.
Saginaw · 1 mi away
1.63 MGD
Bridgeport · 7 mi away
1.79 MGD
Saginaw · 7 mi away
5.22 MGD
Bay City · 10 mi away
6.86 MGD
Freeland · 11 mi away
1.45 MGD
Reese · 11 mi away
1.16 MGD
Bay City · 11 mi away
5.73 MGD
Frankenmuth · 13 mi away
1.01 MGD
Sources and methodology
Flow, permit and violation figures come from the EPA's ICIS-NPDES discharge monitoring records. Population served comes from the Clean Watersheds Needs Survey 2022. Treatment structures are identified by Klarifi's review of aerial imagery, and capital improvement projects are extracted from published municipal budget documents. Violations are counted over the last three years of monitoring reports.
Data refreshed October 26, 2026; facility record last updated March 1, 2025.
Wastewater terms: POTW · MGD · NPDES permit · Inflow and infiltration · Significant industrial user · WWTP · all terms