Washington water and wastewater capital improvement plans

1,037 planned projects · $6.4B · 24 cities · 25 plans

The 25 capital improvement plans and adopted budgets Klarifi has extracted for Washington list 1,037 water, sewer and wastewater line items with a combined planning budget of $6.4B across 24 cities. Seattle has the largest plan at $3.0B. Each city page lists its largest projects with budgets and years, links the source document and the city's treatment plants.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

Wastewater plants in WashingtonWashington NPDES permits →

Cities in Washington with water and sewer capital plans

Washington cities ranked by the combined planning budget of their water, sewer and wastewater line items.
#CityLine itemsBudgetPlans
1Seattle70$3.0B2
2Vancouver135$1.2B1
3Tacoma10$547M1
4Spokane244$518M1
5Edmonds23$245M1
6Monroe51$101M1
7Olympia80$99M1
8Kennewick36$94M1
9Yakima38$84M1
10Richland19$83M1
11Puyallup50$83M1
12Pullman55$61M1
13Walla Walla40$50M1
14Federal Way21$49M1
15Shelton17$41M1
16Bainbridge Island24$31M1
17Snoqualmie11$30M1
18Longview44$29M1
19Poulsbo20$26M1
20Des Moines17$17M1
21Kelso9$16M1
22Eatonville6$7M1
23Duvall12$7M1
24Mount Vernon5$5M1

Planned spend by start year

Before 2026

$5.0B

592 items

2026

$187M

121 items

2027

$397M

108 items

2028

$158M

77 items

2029

$138M

61 items

2030

$233M

46 items

2031

$13M

5 items

2032 and later

$227M

27 items

By department

Line items and planning budgets by utility department, Washington.
DepartmentLine itemsBudgetShare
Wastewater304$2.0B32%
Sewer234$1.9B29%
Water Supply276$1.7B26%
Water Distribution223$802M13%

Project types in Washington

Water mains and distribution · 196 · $1.2BStormwater and flood resilience · 55 · $1.2BSewer rehabilitation and I&I · 144 · $939MForce mains and interceptors · 47 · $494MStorage tanks and reservoirs · 48 · $279MWastewater treatment plant upgrades · 26 · $270MPFAS treatment · 12 · $253MPump stations · 81 · $231MWells and groundwater · 44 · $137MPlanning, studies and asset management · 36 · $135M

The largest planned projects in Washington

The ten largest water, sewer and wastewater line items in Washington plans by planning budget.
#ProjectCityTypeBudgetYears
1Ship Canal Water Quality ProjectSeattle, WAForce mains and interceptors$240M2025–2028
2Watermain RehabilitationSeattle, WAWater mains and distribution$210M2025–2030
3Pipe Renewal ProgramSeattle, WASewer rehabilitation and I&I$197M2025–2030
4Combined Sewer OverflowsSeattle, WASewer rehabilitation and I&I$184M2025–2026
5Westside Solids Treatment UpgradesVancouver, WAWastewater treatment plant upgrades$180M2027–2030
6Shared Cost ProjectsSeattle, WAStormwater and flood resilience$176M2025–2026
7Future CSO ProjectsSeattle, WAStormwater and flood resilience$176M2025–2030
8Water Supply/Transmission/StorageTacoma, WAWater mains and distribution$126M2025–2030
9GSI for Protection of Beneficial UsesSeattle, WAStormwater and flood resilience$125M2025–2030
10DistributionSeattle, WAWater mains and distribution$119M2025–2026

All 1,037 Washington line items in Klarifi

Every project with its description, page reference and source document, filterable by city, department, type, budget and year, linked to the plants and decision-makers in each city.

Start a free trial

Washington capital plan questions

Sources and methodology

Budgets and years are as published in each city’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Data refreshed September 11, 2026.