Snoqualmie, Washington: water and wastewater capital improvement projects

11 line items · $30M · starting 2028 · 1 plan

Snoqualmie's published capital plans list 11 water, sewer and wastewater line items with a combined planning budget of $30M, of which 2 items worth $4M sit in the wastewater and sewer departments. The largest single item is Snoqualmie Mill Water Main Loop Project at $6M (2025–2026). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Snoqualmie

The 10 largest water, sewer and wastewater line items in Snoqualmie’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1Snoqualmie Mill Water Main Loop ProjectWater DistributionWater mains and distribution$6M2025–2026
21040 Zone Reservoir Addition ProjectWater DistributionStorage tanks and reservoirs$5M2028
3599 Zone Reservoir Addition ProjectWater DistributionStorage tanks and reservoirs$4M2025–2028
4SR 202 Bridge Utility Main Replacement ProjectWater DistributionWater mains and distribution$4M2025–2028
5Eagle Lake Water Reclamation Basin Improvement ProjectSewerWastewater treatment plant upgrades$3M2025–2026
6South Wellfield Improvement ProjectWater SupplyWells and groundwater$3M2025–2026
7Source of Supply Improvement ProjectWater SupplyWells and groundwater$1M2025–2026
8Water Reclamation Facility Improvements - Phase 3SewerWastewater treatment plant upgrades$1M2025
9Canyon Springs Improvement ProjectWater SupplyWater mains and distribution$1M2028
10705 Zone Booster Pump Station Improvement ProjectWater DistributionPump stations$575K2025–2026

1 more line items in Snoqualmie, with descriptions and contacts

Klarifi holds every Snoqualmie line item with its description, the page it appears on and the source document. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$24M

9 items

2028

$6M

2 items

By department

Line items and planning budgets by department, Snoqualmie.
DepartmentLine itemsBudgetShare
Sewer2$4M15%
Water Supply3$6M18%
Water Distribution6$20M67%

Wastewater treatment plants in Snoqualmie

1 publicly owned treatment plant in Snoqualmie with 2 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Snoqualmie WWTPWA00224032

Other Washington cities with capital plans

Snoqualmie capital plan questions

Sources and methodology

Budgets and years are as published in Snoqualmie’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2023–2028 (11 line items).

Data refreshed September 11, 2026.