Monroe, Washington: water and wastewater capital improvement projects

51 line items · $101M · starting 2026–2030 · 1 plan

Monroe's published capital plans list 51 water, sewer and wastewater line items with a combined planning budget of $101M, of which 20 items worth $72M sit in the wastewater and sewer departments. The largest single item is Biosolids Treatment Project (CIP 5) at $29M (2025–2026). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Monroe

The 10 largest water, sewer and wastewater line items in Monroe’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1Biosolids Treatment Project (CIP 5)WastewaterBiosolids, sludge and dewatering$29M2025–2026
2CIP 3 Membrane Enhanced TrtmntWastewaterMembranes and filtration$18M2029–2030
3Valley View Pump Station UpgradesSewerPump stations$6M2026–2027
4Fryelands PS and FM UpgradesSewer$5M2029–2030
5Trombley Hill from Reservoir to Airport/179th SEWater DistributionStorage tanks and reservoirs$4M2025–2026
6North Hill 116th SE and 227th SE; connect to Wagner 517; Install PRVsWater Distribution$3M2028–2029
7Woods Creek Road - Tjerne to Ingraham RdWater DistributionWater mains and distribution$2M2028–2029
8Old Owen PS UpgradesSewer$2M2029–2030
9Lord Hill PS - Equipment ReplacementWater DistributionVehicles and equipment$2M2028
10Tester Rd PS - Equipment ReplacementWater DistributionVehicles and equipment$2M2027

41 more line items in Monroe, with descriptions and contacts

Klarifi holds every Monroe line item with its description, the page it appears on and the source document. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$41M

18 items

2026

$9M

6 items

2027

$6M

5 items

2028

$14M

10 items

2029

$28M

7 items

2030

$3M

5 items

By department

Line items and planning budgets by department, Monroe.
DepartmentLine itemsBudgetShare
Wastewater9$51M50%
Sewer11$21M21%
Water Supply5$3M3%
Water Distribution26$26M26%

Project types in Monroe's plan

Wastewater treatment plants in Monroe

No publicly owned treatment plant is recorded under Monroe in the facility directory; the city may be served by a regional plant listed under another municipality. Browse all plants in Washington.

Other Washington cities with capital plans

Monroe capital plan questions

Sources and methodology

Budgets and years are as published in Monroe’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2025–2030 (51 line items).

Data refreshed September 11, 2026.