135 line items · $1.2B · starting 2026–2031 · 1 plan
Vancouver's published capital plans list 135 water, sewer and wastewater line items with a combined planning budget of $1.2B, of which 78 items worth $684M sit in the wastewater and sewer departments. The largest single item is Westside Solids Treatment Upgrades at $180M (2027–2030). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Westside Solids Treatment Upgrades | Wastewater | Wastewater treatment plant upgrades | $180M | 2027–2030 |
| 2 | Operations Center Redevelopment | Water Supply | Planning, studies and asset management | $108M | 2025–2028 |
| 3 | Capital Preservation - Collection System | Wastewater | Sewer rehabilitation and I&I | $78M | 2025–2045 |
| 4 | IR - Interceptor Rehabilitation | Wastewater | Force mains and interceptors | $78M | 2025–2045 |
| 5 | Westside Treatment Capacity Expansion | Wastewater | — | $60M | 2042 |
| 6 | Marine Park Phase 3 - Complete Full Site Capacity Improvements | Wastewater | — | $49M | 2037–2038 |
| 7 | Capital Preservation and Compliance | Wastewater | Wastewater treatment plant upgrades | $47M | 2025–2042 |
| 8 | Water Station 3 Site Upgrades | Water Supply | PFAS treatment | $42M | 2025–2029 |
| 9 | WS 1 PFAS Treatment System | Water Supply | PFAS treatment | $39M | 2025–2029 |
| 10 | WS 9 PFAS Treatment System | Water Supply | PFAS treatment | $35M | 2025–2028 |
125 more line items in Vancouver, with descriptions and contacts
Klarifi holds every Vancouver line item with its description, the page it appears on and the source document. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$659M
81 items
2026
$16M
6 items
2027
$195M
8 items
2028
$12M
3 items
2029
$35M
3 items
2030
$37M
3 items
2031
$11M
4 items
2032 and later
$227M
27 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 71 | $670M | 56% |
| Sewer | 7 | $15M | 1% |
| Water Supply | 44 | $488M | 41% |
| Water Distribution | 13 | $19M | 2% |
1 publicly owned treatment plant in Vancouver. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Salmon Creek WWTP | — | WAR000728 | 0 |
Sources and methodology
Budgets and years are as published in Vancouver’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2025–2030 (135 line items).
Data refreshed September 11, 2026.