Kennewick, Washington: water and wastewater capital improvement projects

36 line items · $94M · starting 2026–2030 · 1 plan

Kennewick's published capital plans list 36 water, sewer and wastewater line items with a combined planning budget of $94M, of which 20 items worth $29M sit in the wastewater and sewer departments. The largest single item is PFAS Treatment Sys. @ Ranney Collector 5 at $35M (2025–2029). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Kennewick

The 10 largest water, sewer and wastewater line items in Kennewick’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1PFAS Treatment Sys. @ Ranney Collector 5Water SupplyPFAS treatment$35M2025–2029
2Clearwater Ave Interceptor Phase 1SewerForce mains and interceptors$14M2028–2029
3Zone 1 Transmission Main Phase 2Water DistributionWater mains and distribution$4M2026–2027
4Zone 1 Transmission Main Phase 1Water DistributionWater mains and distribution$4M2025–2026
5Zone 1 Transmission Main Phase 3Water DistributionWater mains and distribution$4M2027–2028
6Zone 1 Transmission Main Phase 4Water DistributionWater mains and distribution$4M2028–2029
7Fire Flow DeficienciesWater SupplyWater mains and distribution$3M2025–2030
8SCADA & PLC UpgradesSewerSCADA, controls and instrumentation$3M2025–2027
9Sewerline Renewals and ReplacementsSewerSewer rehabilitation and I&I$3M2025–2030
10Zone 4 East Transmission MainWater DistributionWater mains and distribution$2M2029–2030

26 more line items in Kennewick, with descriptions and contacts

Klarifi holds every Kennewick line item with its description, the page it appears on and the source document. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$57M

20 items

2026

$6M

5 items

2027

$4M

2 items

2028

$20M

3 items

2029

$5M

4 items

2030

$2M

2 items

By department

Line items and planning budgets by department, Kennewick.
DepartmentLine itemsBudgetShare
Sewer20$29M31%
Water Supply5$39M42%
Water Distribution11$26M27%

Project types in Kennewick's plan

Wastewater treatment plants in Kennewick

No publicly owned treatment plant is recorded under Kennewick in the facility directory; the city may be served by a regional plant listed under another municipality. Browse all plants in Washington.

Other Washington cities with capital plans

Kennewick capital plan questions

Sources and methodology

Budgets and years are as published in Kennewick’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2025–2030 (36 line items).

Data refreshed September 11, 2026.