19 line items · $83M · starting 2026 · 1 plan
Richland's published capital plans list 19 water, sewer and wastewater line items with a combined planning budget of $83M, of which 9 items worth $34M sit in the wastewater and sewer departments. The largest single item is Downtown Connectivity Transportation Improvements at $24M (2025–2026). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Downtown Connectivity Transportation Improvements | Water Distribution | Buildings, HVAC and site work | $24M | 2025–2026 |
| 2 | Wastewater Treatment Plant Anaerobic Digester Improvements | Wastewater | Anaerobic digesters and biogas | $11M | 2025–2027 |
| 3 | Wastewater Collection System Rehabilitation and Replacement Program | Wastewater | Sewer rehabilitation and I&I | $8M | 2025–2028 |
| 4 | Horn Rapids Irrigation Water System Upgrades | Water Supply | Water mains and distribution | $6M | 2025–2026 |
| 5 | Water Distribution System Repairs and Replacements | Water Distribution | Water mains and distribution | $6M | 2025–2028 |
| 6 | Water System SCADA Replacement | Water Distribution | SCADA, controls and instrumentation | $5M | 2025–2028 |
| 7 | Wastewater Treatment Plant - Grit Works Rehabilitation | Wastewater | Headworks, screening and grit | $4M | 2025–2026 |
| 8 | Wastewater SCADA Replacement | Wastewater | SCADA, controls and instrumentation | $3M | 2025–2028 |
| 9 | Water Treatment Renewal and Replacement Program | Water Distribution | Water treatment plants | $3M | 2025–2028 |
| 10 | Wastewater Treatment Plant Infrastructure Renewal & Replacement Program | Wastewater | Wastewater treatment plant upgrades | $3M | 2025–2028 |
9 more line items in Richland, with descriptions and contacts
Klarifi holds every Richland line item with its description, the page it appears on and the source document, plus 1 verified contact at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$81M
18 items
2026
$2M
1 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 8 | $31M | 37% |
| Sewer | 1 | $3M | 3% |
| Water Supply | 3 | $9M | 11% |
| Water Distribution | 7 | $41M | 49% |
1 publicly owned treatment plant in Richland. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Richland City Wastewater Lab | 6.31 | WA0020419 | 0 |
Sources and methodology
Budgets and years are as published in Richland’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2025–2030 (19 line items).
Data refreshed September 11, 2026.