9 line items · $16M · starting 2026 · 1 plan
Kelso's published capital plans list 9 water, sewer and wastewater line items with a combined planning budget of $16M, of which 4 items worth $5M sit in the wastewater and sewer departments. The largest single item is Water Source/Supply Implementation at $6M (2025–2027). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Water Source/Supply Implementation | Water Supply | Planning, studies and asset management | $6M | 2025–2027 |
| 2 | Manasco Drive Interceptor Replacement | Sewer | Force mains and interceptors | $3M | 2026–2027 |
| 3 | Annual Sewer Replacement | Sewer | Sewer rehabilitation and I&I | $2M | 2025–2027 |
| 4 | Annual Small Diameter / AC Replacement | Water Supply | Water mains and distribution | $1M | 2025–2027 |
| 5 | N Kelso-Pacific-Redpath to Dirk | Water Distribution | Water mains and distribution | $1M | 2025 |
| 6 | Allen Street Water Main Improvements | Water Distribution | Water mains and distribution | $1M | 2026–2027 |
| 7 | Telemetry Improvement Implementation | Water Supply | SCADA, controls and instrumentation | $850K | 2025 |
| 8 | Grade Street Pump Station Refit | Sewer | Pump stations | $500K | 2025 |
| 9 | Telemetry Improvement Implementation | Sewer | SCADA, controls and instrumentation | $450K | 2025 |
Descriptions, page references and contacts for Kelso
Klarifi holds every Kelso line item with its description, the page it appears on and the source document. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$12M
7 items
2026
$4M
2 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Sewer | 4 | $5M | 33% |
| Water Supply | 3 | $8M | 51% |
| Water Distribution | 2 | $2M | 15% |
No publicly owned treatment plant is recorded under Kelso in the facility directory; the city may be served by a regional plant listed under another municipality. Browse all plants in Washington.
Sources and methodology
Budgets and years are as published in Kelso’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2025–2027 (9 line items).
Data refreshed September 11, 2026.