44 line items · $29M · starting 2026–2029 · 1 plan
Longview's published capital plans list 44 water, sewer and wastewater line items with a combined planning budget of $29M, of which 14 items worth $17M sit in the wastewater and sewer departments. The largest single item is Annual Main Relining at $4M (2025–2029). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Annual Main Relining | Sewer | Water mains and distribution | $4M | 2025–2029 |
| 2 | Annual Main Replacements | Sewer | Water mains and distribution | $4M | 2025–2029 |
| 3 | Replace Castleman Line | Water Distribution | — | $2M | 2029 |
| 4 | 2277 48th Pump Station | Sewer | Pump stations | $2M | 2028–2029 |
| 5 | 5501 Finch Pump Station | Sewer | Pump stations | $2M | 2026–2027 |
| 6 | 4014 Oak Street Pump Station | Sewer | Pump stations | $2M | 2025–2026 |
| 7 | CIP #2223 Madrona Waterline Replacement | Water Distribution | Water mains and distribution | $1M | 2025–2026 |
| 8 | 2600 42nd Pump Station | Sewer | Pump stations | $1M | 2025 |
| 9 | CIP #2275 Fill Line to Water Resevior | Water Distribution | — | $1M | 2025–2026 |
| 10 | Mt. Solo Waterline | Water Distribution | Water mains and distribution | $1M | 2025 |
34 more line items in Longview, with descriptions and contacts
Klarifi holds every Longview line item with its description, the page it appears on and the source document. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$21M
31 items
2026
$3M
4 items
2027
$561K
4 items
2028
$2M
1 items
2029
$3M
4 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Sewer | 14 | $17M | 59% |
| Water Supply | 10 | $1M | 5% |
| Water Distribution | 20 | $10M | 36% |
1 publicly owned treatment plant in Longview. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Three Rivers Regional WWTP | — | WA0037788 | 0 |
Sources and methodology
Budgets and years are as published in Longview’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: Adopted Budget 2025–2026 (44 line items).