55 line items · $61M · starting 2026–2030 · 1 plan
Pullman's published capital plans list 55 water, sewer and wastewater line items with a combined planning budget of $61M, of which 18 items worth $30M sit in the wastewater and sewer departments. The largest single item is Sewer Extension from New Airport Terminal to East City Limits at $7M (2025–2030). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Sewer Extension from New Airport Terminal to East City Limits | Sewer | Sewer rehabilitation and I&I | $7M | 2025–2030 |
| 2 | Advanced Metering Infrastructure (AMI) Upgrade Project (Grant Dependent) | Water Distribution | Meters and AMI | $6M | 2025–2028 |
| 3 | Replace the Belt Filter Press and Rehab the Equipment Building Trusses | Wastewater | Biosolids, sludge and dewatering | $6M | 2025–2028 |
| 4 | Miscellaneous Sewer Line Replacement and/or Rehabilitation Program | Sewer | Sewer rehabilitation and I&I | $4M | 2025–2030 |
| 5 | PBAC Water Supply Alternative | Water Supply | Wells and groundwater | $4M | 2027–2028 |
| 6 | Water Extension from New Airport Terminal to East City Limits | Water Distribution | Water mains and distribution | $4M | 2025–2030 |
| 7 | Remote Biosolids Storage Area | Wastewater | Biosolids, sludge and dewatering | $3M | 2027–2029 |
| 8 | UV Disinfection & Miscellaneous Improvements Bond Repayment | Wastewater | Disinfection and UV | $3M | 2025–2028 |
| 9 | Water Extension to New Airport Terminal | Water Distribution | Water mains and distribution | $3M | 2025–2026 |
| 10 | Sewer Plan Identified CIP Projects | Sewer | Sewer rehabilitation and I&I | $2M | 2025–2030 |
45 more line items in Pullman, with descriptions and contacts
Klarifi holds every Pullman line item with its description, the page it appears on and the source document, plus 2 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$45M
34 items
2026
$4M
6 items
2027
$9M
6 items
2028
$2M
5 items
2029
$54K
1 items
2030
$2M
3 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 8 | $14M | 22% |
| Sewer | 10 | $16M | 27% |
| Water Supply | 16 | $10M | 17% |
| Water Distribution | 21 | $21M | 34% |
1 publicly owned treatment plant in Pullman with 1 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Pullman City Muni SW | 2.13 | WA0044652 | 1 |
Sources and methodology
Budgets and years are as published in Pullman’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2025–2030 (55 line items).
Data refreshed September 11, 2026.