Puyallup, Washington: water and wastewater capital improvement projects

50 line items · $83M · starting 2026–2030 · 1 plan

Puyallup's published capital plans list 50 water, sewer and wastewater line items with a combined planning budget of $83M, of which 32 items worth $53M sit in the wastewater and sewer departments. The largest single item is East Main + Valley combined Trunk Line Downstream Improvements at $9M (2025–2027). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Puyallup

The 10 largest water, sewer and wastewater line items in Puyallup’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1East Main + Valley combined Trunk Line Downstream ImprovementsSewerForce mains and interceptors$9M2025–2027
2Sewer System ImprovementsSewerSewer rehabilitation and I&I$8M2025–2030
3Reservoir Recoating & Seismic Retrofit - 39th Ave SE Tank #1Water DistributionStorage tanks and reservoirs$7M2027–2028
4North Trunk Sewer Main Improvements - River Road 9th to Treatment PlantSewerForce mains and interceptors$5M2029–2030
5Aging Equipment ReplacementSewerVehicles and equipment$5M2025–2030
6Recreation Center Well No. 18Water SupplyWells and groundwater$5M2028–2029
7Effluent Filtration AlternativesSewerMembranes and filtration$4M2027–2029
8AMI Water Meter Replacement and UpgradesWater DistributionMeters and AMI$3M2028
9Water Main Rplcmt - 14th St SW Phase 1 & 2, 12th Ave to 15th AveWater DistributionWater mains and distribution$3M2026–2027
10Sewer System Expansion Opportunity FundingSewerSewer rehabilitation and I&I$3M2025–2030

40 more line items in Puyallup, with descriptions and contacts

Klarifi holds every Puyallup line item with its description, the page it appears on and the source document. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$32M

16 items

2026

$8M

9 items

2027

$20M

10 items

2028

$12M

7 items

2029

$10M

6 items

2030

$500K

2 items

By department

Line items and planning budgets by department, Puyallup.
DepartmentLine itemsBudgetShare
Sewer32$53M64%
Water Supply3$6M8%
Water Distribution15$24M29%

Project types in Puyallup's plan

Wastewater treatment plants in Puyallup

No publicly owned treatment plant is recorded under Puyallup in the facility directory; the city may be served by a regional plant listed under another municipality. Browse all plants in Washington.

Other Washington cities with capital plans

Puyallup capital plan questions

Sources and methodology

Budgets and years are as published in Puyallup’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2025–2030 (50 line items).

Data refreshed September 11, 2026.