36 line items · $4.0B · starting 2028–2030 · 1 plan

Nashville's published capital plans list 36 water, sewer and wastewater line items with a combined planning budget of $4.0B, of which 31 items worth $3.2B sit in the wastewater and sewer departments. The largest single item is General Water Treatment Plant Replacement and Refurbishment at $1.0B (2025–2030). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Nashville

The 10 largest water, sewer and wastewater line items in Nashville’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1General Water Treatment Plant Replacement and RefurbishmentWastewaterWater treatment plants$1.0B2025–2030
2Clean Water NashvilleSewer$750M2025–2030
3Water Distribution ProjectsWater DistributionWater mains and distribution$667M2025–2030
4Biosolids and Odor ControlWastewaterBiosolids, sludge and dewatering$441M2025–2030
5Dry Creek Wastewater Treatment PlantWastewaterWastewater treatment plant upgrades$172M2025
6Combined System Projects Related to Downstream PolicyWastewater$150M2025–2030
7Stormwater Master Planning Construction ProjectsSewerStormwater and flood resilience$90M2028–2030
8Stormwater - Capital Construction / Remedial Maintenance inWater DistributionStormwater and flood resilience$86M2025–2030
9Central Wastewater Treatment PlantWastewaterWastewater treatment plant upgrades$84M2025–2030
10Customer Care CenterWastewater$50M2030

26 more line items in Nashville, with descriptions and contacts

Klarifi holds every Nashville line item with its description, the page it appears on and the source document, plus 3 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$3.9B

34 items

2028

$90M

1 items

2030

$50M

1 items

By department

Line items and planning budgets by department, Nashville.
DepartmentLine itemsBudgetShare
Wastewater22$2.2B56%
Sewer9$993M25%
Water Supply1$24M1%
Water Distribution4$766M19%

Project types in Nashville's plan

Wastewater treatment plants in Nashville

4 publicly owned treatment plants in Nashville with 108 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Metro Central Wastewater Treatment Plant88.2TNL02057562
Whites Creek Wastewater Treatment Plant21.51TN002497039
Harpeth Valley Utility District STP4.76TN00747484
Nashville J.P.Priest Lake Hamilton Creek Recreation Area0.0015TN00285503

Other Tennessee cities with capital plans

Nashville capital plan questions

Sources and methodology

Budgets and years are as published in Nashville’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2025–2030 (36 line items).

Data refreshed September 11, 2026.