Maryville, Tennessee: water and wastewater capital improvement projects
Water, sewer and wastewater line items in Maryville’s published capital improvement plans and adopted budgets, with budgets, years and the source documents.
- Planned budget
- $22M
- Line items
- 17
- Wastewater and sewer
- $11M
- Starting
- 2026
- Plan
- 1
Maryville's published capital plans list 17 water, sewer and wastewater line items with a combined planning budget of $22M, of which 8 items worth $11M sit in the wastewater and sewer departments. The largest single item is RWWTP Facilities New Construction at $5M (2026). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
The largest water and sewer projects in Maryville
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | RWWTP Facilities New Construction | Wastewater | — | $5M | 2026 |
| 2 | Administrative Projects | Water Supply | — | $5M | 2026 |
| 3 | Water Replacements and Relocations | Water Distribution | — | $3M | 2026 |
| 4 | RWWTP Major Facilities Maintenance | Wastewater | — | $2M | 2026 |
| 5 | Water Filtration Plant Major Facilities Maintenance | Water Supply | Membranes and filtration | $1M | 2026 |
| 6 | Sewer Rehabilitation and Replacement | Sewer | Sewer rehabilitation and I&I | $1M | 2026 |
| 7 | Sewer Extensions | Sewer | Sewer rehabilitation and I&I | $1M | 2026 |
| 8 | Sewer Lift Stations | Sewer | Lift stations | $892K | 2026 |
| 9 | Water Meters and Services | Water Distribution | Meters and AMI | $510K | 2026 |
| 10 | Equipment Replacement | Water Supply | Vehicles and equipment | $372K | 2026 |
Planned spend by start year
By department
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 4 | $8M | 35% |
| Sewer | 4 | $3M | 16% |
| Water Supply | 6 | $7M | 33% |
| Water Distribution | 3 | $4M | 17% |
Project types in Maryville's plan
- Sewer rehabilitation and I&I3 line items$2M
- Membranes and filtration1 line items$1M
- Lift stations1 line items$892K
- Meters and AMI1 line items$510K
- Storage tanks and reservoirs1 line items$300K
- SCADA, controls and instrumentation2 line items$167K
- Pump stations1 line items$95K
Wastewater treatment plants in Maryville
1 publicly owned treatment plant in Maryville. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Lanier Elementary School | — | TN0062391 | 0 |
Other Tennessee cities with capital plans
- $4.0B
- $483M
- $93M
- $54M
- $16M
- $9M
Maryville capital plan questions
How much is Maryville, TN planning to spend on water and sewer infrastructure?
Maryville’s published capital plans list 17 water, sewer and wastewater line items with a combined budget of $22M, of which $11M is in the wastewater and sewer departments.
What is the largest capital project in Maryville’s plan?
RWWTP Facilities New Construction, budgeted at $5M and scheduled for 2026 under the Wastewater department.
When do Maryville’s water and sewer projects start?
17 projects ($22M) start in 2026. Budgets are as published in the plan and can change at adoption.
How do I find the contacts and full project list for Maryville?
Klarifi holds every line item with its description, page reference and source document. The public page shows the ten largest items; the full list is available with a free trial.