5 line items · $93M · starting 2026 · 1 plan

Columbia's published capital plans list 5 water, sewer and wastewater line items with a combined planning budget of $93M, of which 5 items worth $93M sit in the wastewater and sewer departments. The largest single item is Wastewater Treatment Plant at $82M (2026–2028). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Columbia

The 5 largest water, sewer and wastewater line items in Columbia’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1Wastewater Treatment PlantWastewaterWastewater treatment plant upgrades$82M2026–2028
2Bear Creek Pike Station UpgradeWastewater$8M2025
3Vehicles & EquipmentWastewaterVehicles and equipment$2M2026–2030
4Duck River Station UpgradeWastewater$1M2025
5MIS Computer/Tech Replacement ScheduleWastewaterVehicles and equipment$98K2026–2030

Descriptions, page references and contacts for Columbia

Klarifi holds every Columbia line item with its description, the page it appears on and the source document, plus 2 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$10M

2 items

2026

$84M

3 items

By department

Line items and planning budgets by department, Columbia.
DepartmentLine itemsBudgetShare
Wastewater5$93M100%

Wastewater treatment plants in Columbia

1 publicly owned treatment plant in Columbia with 68 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
City Of Columbia Wastewater Treatment Plant5.06TN005610368

Other Tennessee cities with capital plans

Columbia capital plan questions

Sources and methodology

Budgets and years are as published in Columbia’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2024–2030 (5 line items).

Data refreshed September 11, 2026.