48 line items · $54M · starting 2026–2028 · 1 plan
Crossville's published capital plans list 48 water, sewer and wastewater line items with a combined planning budget of $54M, of which 17 items worth $17M sit in the wastewater and sewer departments. The largest single item is Meadow Park Lake Dam at $14M (2027–2028). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Meadow Park Lake Dam | Water Supply | — | $14M | 2027–2028 |
| 2 | Meadow Park Lake Water Treatment Plant Expansion | Water Supply | Wastewater treatment plant upgrades | $7M | 2027 |
| 3 | TDOT Phase 2 of 127 Utility Relocation | Sewer | — | $6M | 2026 |
| 4 | MP Ceramic Filter | Water Supply | Membranes and filtration | $4M | 2026 |
| 5 | TDOT Phase 3 of 127 Utility Relocation | Water Distribution | Water mains and distribution | $3M | 2026 |
| 6 | Meadow Park Lake Sewer | Sewer | Sewer rehabilitation and I&I | $3M | 2026 |
| 7 | Veolia - I&I Removal | Sewer | Sewer rehabilitation and I&I | $3M | 2025–2029 |
| 8 | Northwest Connector Sewer Service | Sewer | Sewer rehabilitation and I&I | $2M | 2028 |
| 9 | Engineering Sparta Drive Area Water Line Upgrade | Water Distribution | Water mains and distribution | $1M | 2025 |
| 10 | Lower Headworks Screens | Wastewater | Headworks, screening and grit | $750K | 2026 |
38 more line items in Crossville, with descriptions and contacts
Klarifi holds every Crossville line item with its description, the page it appears on and the source document. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$8M
18 items
2026
$20M
20 items
2027
$22M
7 items
2028
$3M
3 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 9 | $3M | 6% |
| Sewer | 8 | $14M | 27% |
| Water Supply | 11 | $26M | 49% |
| Water Distribution | 20 | $10M | 18% |
1 publicly owned treatment plant in Crossville with 26 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Crossville STP | 2.61 | TN0024996 | 26 |
Sources and methodology
Budgets and years are as published in Crossville’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2025–2029 (48 line items).