10 line items · $5M · starting 2026–2030 · 1 plan
Milton's published capital plans list 10 water, sewer and wastewater line items with a combined planning budget of $5M. The largest single item is Water Main Replacement - Union Street at $1M (2028). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Water Main Replacement - Union Street | Water Distribution | Water mains and distribution | $1M | 2028 |
| 2 | Water Main Replacement - Federal Street | Water Distribution | Water mains and distribution | $1M | 2028 |
| 3 | Water Main Replacement - Route 16 | Water Distribution | Water mains and distribution | $1M | 2028 |
| 4 | Water Main Replacement - Pine / Spruce | Water Distribution | Water mains and distribution | $362K | 2029 |
| 5 | Water Main Replacement - Hemlock/Boxwood Street | Water Distribution | Water mains and distribution | $286K | 2026 |
| 6 | Water Main Replacement - Yew Street | Water Distribution | Water mains and distribution | $166K | 2028 |
| 7 | Water Main Replacement - Hazzard Street | Water Distribution | Water mains and distribution | $163K | 2030 |
| 8 | Water Main Replacement - Cedar Street | Water Distribution | Water mains and distribution | $153K | 2027 |
| 9 | Water Main Replacement - Conwell Street | Water Distribution | Water mains and distribution | $153K | 2027 |
| 10 | 5-year hydrant flow test (town-wide) | Water Distribution | Water mains and distribution | $18K | 2028 |
Descriptions, page references and contacts for Milton
Klarifi holds every Milton line item with its description, the page it appears on and the source document. Track new plans as they are adopted and compare with similar projects in other cities.
2026
$286K
1 items
2027
$306K
2 items
2028
$4M
5 items
2029
$362K
1 items
2030
$163K
1 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Water Distribution | 10 | $5M | 100% |
1 publicly owned treatment plant in Milton with 11 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Milton Wastewater Treatment Plant | 0.23 | DE0021491 | 11 |
Sources and methodology
Budgets and years are as published in Milton’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2026–2030 (10 line items).
Data refreshed September 11, 2026.