Goshen, Indiana: water and wastewater capital improvement projects
Water, sewer and wastewater line items in Goshen’s published capital improvement plans and adopted budgets, with budgets, years and the source documents.
- Planned budget
- $17M
- Line items
- 5
- Wastewater and sewer
- $3M
- Starting
- 2026–2028
- Plan
- 1
Goshen's published capital plans list 5 water, sewer and wastewater line items with a combined planning budget of $17M, of which 1 items worth $3M sit in the wastewater and sewer departments. The largest single item is Steury Ave/Lincoln Ave Drainage Improvements at $9M (2025–2026). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
The largest water and sewer projects in Goshen
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Steury Ave/Lincoln Ave Drainage Improvements | Water Distribution | Stormwater and flood resilience | $9M | 2025–2026 |
| 2 | Water Main Installation – Clinton, Bashor & Reliance | Water Distribution | Water mains and distribution | $3M | 2028 |
| 3 | Dierdorff Lift Station/Sewer Extension | Sewer | Lift stations | $3M | 2026–2027 |
| 4 | 10th & Douglas Reconstruction | Water Distribution | Water mains and distribution | $1M | 2024–2025 |
| 5 | Pike Street Water Main Extension | Water Distribution | Water mains and distribution | $275K | 2028 |
Planned spend by start year
By department
| Department | Line items | Budget | Share |
|---|---|---|---|
| Sewer | 1 | $3M | 17% |
| Water Distribution | 4 | $14M | 83% |
Project types in Goshen's plan
- Stormwater and flood resilience1 line items$9M
- Water mains and distribution3 line items$5M
- Lift stations1 line items$3M
Wastewater treatment plants in Goshen
1 publicly owned treatment plant in Goshen with 13 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Goshen City Waste Water Treatment Plant Improvements | 3.48 | IN0025755 | 13 |
Goshen capital plan questions
How much is Goshen, IN planning to spend on water and sewer infrastructure?
Goshen’s published capital plans list 5 water, sewer and wastewater line items with a combined budget of $17M, of which $3M is in the wastewater and sewer departments.
What is the largest capital project in Goshen’s plan?
Steury Ave/Lincoln Ave Drainage Improvements, budgeted at $9M and scheduled for 2025–2026 under the Water Distribution department.
When do Goshen’s water and sewer projects start?
1 projects ($3M) start in 2026 and 2 projects ($4M) start in 2028. Budgets are as published in the plan and can change at adoption.
How do I find the contacts and full project list for Goshen?
Klarifi holds every line item with its description, page reference and source document, plus 25 verified contacts at the city’s treatment plants. The public page shows the ten largest items; the full list is available with a free trial.
Try Klarifi for free
Create your own trial account and explore how Klarifi can help you.