Kittery, Maine: water and wastewater capital improvement projects
Water, sewer and wastewater line items in Kittery’s published capital improvement plans and adopted budgets, with budgets, years and the source documents.
- Planned budget
- $2M
- Line items
- 36
- Wastewater and sewer
- $2M
- Starting
- 2026–2030
- Plan
- 1
Kittery's published capital plans list 36 water, sewer and wastewater line items with a combined planning budget of $2M, of which 36 items worth $2M sit in the wastewater and sewer departments. The largest single item is Annual Sewer Line/Manhole Lining at $326K (2026–2030). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
The largest water and sewer projects in Kittery
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Annual Sewer Line/Manhole Lining | Sewer | Sewer rehabilitation and I&I | $326K | 2026–2030 |
| 2 | Pump Station SCADA | Wastewater | SCADA, controls and instrumentation | $176K | 2027 |
| 3 | I&I Study Collection System | Sewer | Sewer rehabilitation and I&I | $143K | 2026 |
| 4 | JD Loader | Wastewater | Vehicles and equipment | $98K | 2028 |
| 5 | Truck 451 F-550 Utility | Wastewater | Vehicles and equipment | $97K | 2030 |
| 6 | Truck 452 F-550 Dump | Wastewater | Vehicles and equipment | $95K | 2029 |
| 7 | Pump Station #6 Generator | Sewer | Pump stations | $91K | 2028 |
| 8 | Truck Flatbed F-550 | Wastewater | Vehicles and equipment | $72K | 2027 |
| 9 | Jet Rodder | Wastewater | Vehicles and equipment | $54K | 2027 |
| 10 | Magnum Portable Generator | Wastewater | Generators, power and electrical | $50K | 2030 |
Planned spend by start year
By department
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 31 | $968K | 60% |
| Sewer | 5 | $633K | 40% |
Project types in Kittery's plan
- Sewer rehabilitation and I&I2 line items$469K
- Pump stations9 line items$216K
- SCADA, controls and instrumentation1 line items$176K
- Aeration and blowers4 line items$103K
- Generators, power and electrical2 line items$95K
- Buildings, HVAC and site work3 line items$33K
- Biosolids, sludge and dewatering1 line items$24K
- Membranes and filtration1 line items$18K
Wastewater treatment plants in Kittery
No publicly owned treatment plant is recorded under Kittery in the facility directory; the city may be served by a regional plant listed under another municipality. Browse all plants in Maine.
Other Maine cities with capital plans
- $88M
- $6M
- $2M
- $483K
Kittery capital plan questions
How much is Kittery, ME planning to spend on water and sewer infrastructure?
Kittery’s published capital plans list 36 water, sewer and wastewater line items with a combined budget of $2M, of which $2M is in the wastewater and sewer departments.
What is the largest capital project in Kittery’s plan?
Annual Sewer Line/Manhole Lining, budgeted at $326K and scheduled for 2026–2030 under the Sewer department.
When do Kittery’s water and sewer projects start?
8 projects ($633K) start in 2026 and 9 projects ($392K) start in 2027. Budgets are as published in the plan and can change at adoption.
How do I find the contacts and full project list for Kittery?
Klarifi holds every line item with its description, page reference and source document. The public page shows the ten largest items; the full list is available with a free trial.
Try Klarifi for free
Create your own trial account and explore how Klarifi can help you.