The 5 capital improvement plans and adopted budgets Klarifi has extracted for Maine list 87 water, sewer and wastewater line items with a combined planning budget of $97M across 5 cities. South Portland has the largest plan at $88M. Each city page lists its largest projects with budgets and years, links the source document and the city's treatment plants.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | City | Line items | Budget | Plans |
|---|---|---|---|---|
| 1 | South Portland | 25 | $88M | 1 |
| 2 | Brunswick | 3 | $6M | 1 |
| 3 | Kittery | 36 | $2M | 1 |
| 4 | Lisbon | 17 | $2M | 1 |
| 5 | Farmington | 6 | $483K | 1 |
Before 2026
$5M
9 items
2026
$68M
22 items
2027
$4M
19 items
2028
$18M
13 items
2029
$2M
7 items
2030
$581K
12 items
2031
$125K
2 items
2032 and later
$160K
3 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 51 | $18M | 18% |
| Sewer | 27 | $7M | 7% |
| Water Supply | 2 | $1M | 1% |
| Water Distribution | 7 | $71M | 73% |
| # | Project | City | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Pearl Street Pump Station Upgrades & Construction | South Portland, ME | Pump stations | $49M | 2026 |
| 2 | Increase Conveyance Capacity from CSO #006 to Pearl Street Pump Station | South Portland, ME | Pump stations | $16M | 2028–2030 |
| 3 | Dewatering System Upgrades | South Portland, ME | Biosolids, sludge and dewatering | $15M | 2026–2029 |
| 4 | Old Bath Rd Water Main Ext. | Brunswick, ME | Water mains and distribution | $4M | 2024–2025 |
| 5 | Sewer Lining Program | South Portland, ME | Sewer rehabilitation and I&I | $2M | 2026–2031 |
| 6 | Treatment Plant Headworks Upgrades | South Portland, ME | Headworks, screening and grit | $1M | 2029–2031 |
| 7 | Longfellow Avenue Drainage | Brunswick, ME | Stormwater and flood resilience | $954K | 2027–2029 |
| 8 | Main St. Pump Station Generator Replacement Evaluation and Design | South Portland, ME | Pump stations | $789K | 2026–2028 |
| 9 | Macmillan Drive Drainage | Brunswick, ME | Stormwater and flood resilience | $774K | 2027–2029 |
| 10 | West Hight Pump Station - Force Main Replacement | South Portland, ME | Pump stations | $600K | 2027 |
All 87 Maine line items in Klarifi
Every project with its description, page reference and source document, filterable by city, department, type, budget and year, linked to the plants and decision-makers in each city.
Sources and methodology
Budgets and years are as published in each city’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Data refreshed September 11, 2026.