9 line items · $402K · starting 2026–2028 · 1 plan
Delano's published capital plans list 9 water, sewer and wastewater line items with a combined planning budget of $402K, of which 9 items worth $402K sit in the wastewater and sewer departments. The largest single item is Single Axel Dump Truck - Vehicle #22 at $144K (2028). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Single Axel Dump Truck - Vehicle #22 | Sewer | Vehicles and equipment | $144K | 2028 |
| 2 | Single Axle Dump Truck - Vehicle #23 | Sewer | Vehicles and equipment | $90K | 2026 |
| 3 | Kubota Track Hoe | Wastewater | — | $67K | 2027 |
| 4 | Truck #4 - F-450 | Sewer | Vehicles and equipment | $41K | 2025 |
| 5 | Truck #1 | Sewer | Vehicles and equipment | $23K | 2025 |
| 6 | Skid Loader - Vehicle #34 | Sewer | Vehicles and equipment | $21K | 2028 |
| 7 | Public Works exterior painting | Wastewater | Buildings, HVAC and site work | $7K | 2026 |
| 8 | Computer Equipment | Wastewater | Vehicles and equipment | $6K | 2025–2028 |
| 9 | Painting PW Bldg. | Wastewater | Buildings, HVAC and site work | $4K | 2027 |
Descriptions, page references and contacts for Delano
Klarifi holds every Delano line item with its description, the page it appears on and the source document, plus 2 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$71K
3 items
2026
$96K
2 items
2027
$71K
2 items
2028
$165K
2 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 4 | $84K | 21% |
| Sewer | 5 | $319K | 79% |
1 publicly owned treatment plant in Delano with 76 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Delano WWTP | 0.54 | MN0051250 | 76 |
Sources and methodology
Budgets and years are as published in Delano’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2024–2028 (9 line items).
Data refreshed September 11, 2026.