Klarifi Logo
Try for freeLog in
Klarifi Logo

Mankato, Minnesota: water and wastewater capital improvement projects

28 line items · $104M · starting 2026–2028 · 1 plan

Mankato's published capital plans list 28 water, sewer and wastewater line items with a combined planning budget of $104M, of which 13 items worth $100M sit in the wastewater and sewer departments. The largest single item is Disinfection and Digestion Upgrade at $80M (2025–2026). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Mankato

The 10 largest water, sewer and wastewater line items in Mankato’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1Disinfection and Digestion UpgradeWastewaterAnaerobic digesters and biogas$80M2025–2026
22025 - Regional trunk line - engineering work / construction 3rd aveWastewaterForce mains and interceptors$8M2026–2029
3Infra - Mulberry Liftstation UpgradeWastewaterLift stations$4M2025–2026
42028 - Blower Replacement with turbo blowersWastewaterAeration and blowers$4M2025–2028
5Balcerzak Tower RehabWater SupplyHeadworks, screening and grit$2M2025–2026
6Facility Roof Replacement - medWastewaterBuildings, HVAC and site work$796K2025–2029
7Sand removal system - WRF - MedWastewaterWastewater treatment plant upgrades$728K2026
8North City Reservoir Booster installWater SupplyStorage tanks and reservoirs$650K2026
9Membrane Filter ReplacementWater SupplyMembranes and filtration$575K2028
1020 Year Facility plan - highWastewaterAnaerobic digesters and biogas$500K2026

18 more line items in Mankato, with descriptions and contacts

Klarifi holds every Mankato line item with its description, the page it appears on and the source document. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$92M

13 items

2026

$11M

8 items

2027

$545K

3 items

2028

$915K

4 items

By department

Line items and planning budgets by department, Mankato.
DepartmentLine itemsBudgetShare
Wastewater13$100M95%
Water Supply13$4M4%
Water Distribution2$630K1%

Project types in Mankato's plan

Wastewater treatment plants in Mankato

No publicly owned treatment plant is recorded under Mankato in the facility directory; the city may be served by a regional plant listed under another municipality. Browse all plants in Minnesota.

Other Minnesota cities with capital plans

Mankato capital plan questions

Sources and methodology

Budgets and years are as published in Mankato’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2025–2029 (28 line items).

Data refreshed September 11, 2026.

Try Klarifi for free

Create your own trial account and explore how Klarifi can help you.

Try for free