Prior Lake, Minnesota: water and wastewater capital improvement projects

11 line items · $22M · starting 2026 · 1 plan

Prior Lake's published capital plans list 11 water, sewer and wastewater line items with a combined planning budget of $22M, of which 5 items worth $13M sit in the wastewater and sewer departments. The largest single item is Transportation Plan at $5M (2025–2029). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Prior Lake

The 10 largest water, sewer and wastewater line items in Prior Lake’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1Transportation PlanSewer$5M2025–2029
2Transportation PlanWater Supply$5M2025–2029
3Sewer Lining - Inflow/Infiltration PreventionSewerMembranes and filtration$2M2025–2029
4Technology Plan - SCADAWastewaterSCADA, controls and instrumentation$2M2026–2029
5Lift Station RehabilitationSewerLift stations$2M2025–2029
6Water Storage & Tower ReconditioningWater Supply$2M2026
7EquipmentWater SupplyVehicles and equipment$1M2025–2029
8Current Year Projects - FacilitiesWater Supply$999K2025–2029
9Generator/EquipmentWastewaterGenerators, power and electrical$650K2025–2029
10WellsWater SupplyWells and groundwater$285K2025–2029

1 more line items in Prior Lake, with descriptions and contacts

Klarifi holds every Prior Lake line item with its description, the page it appears on and the source document, plus 2 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$18M

9 items

2026

$4M

2 items

By department

Line items and planning budgets by department, Prior Lake.
DepartmentLine itemsBudgetShare
Wastewater2$3M14%
Sewer3$10M45%
Water Supply6$9M41%

Wastewater treatment plants in Prior Lake

1 publicly owned treatment plant in Prior Lake with 7 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Smsc Water Reclamation Facili0.74MN00679387

Other Minnesota cities with capital plans

Prior Lake capital plan questions

Sources and methodology

Budgets and years are as published in Prior Lake’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2025–2029 (11 line items).

Data refreshed September 11, 2026.