Berlin, New Hampshire: water and wastewater capital improvement projects

8 line items · $3M · starting 2026–2028 · 1 plan

Berlin's published capital plans list 8 water, sewer and wastewater line items with a combined planning budget of $3M, of which 8 items worth $3M sit in the wastewater and sewer departments. The largest single item is Sanitary Line Replacement at $840K (2023–2028). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Berlin

The 8 largest water, sewer and wastewater line items in Berlin’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1Sanitary Line ReplacementSewerSewer rehabilitation and I&I$840K2023–2028
2Modernize Dead River (Bass Shoe) Pump StationSewerPump stations$700K2028
34 bay equipment garageWastewaterBuildings, HVAC and site work$300K2027
4Phase 2 I & I Reductions - Sewer Lines/Sump PumpsSewerPump stations$278K2023–2028
5Phase 2 I & I Reductions - Flat RoofsSewerBuildings, HVAC and site work$156K2023–2028
6Replace Gravity Thickener Covers with 2 new Aluminum DomesWastewaterBiosolids, sludge and dewatering$111K2025
7Build Building over RAS Pinch Valve VaultSewerWater mains and distribution$100K2026
8Utility MappingSewerPlanning, studies and asset management$35K2023–2028

Descriptions, page references and contacts for Berlin

Klarifi holds every Berlin line item with its description, the page it appears on and the source document, plus 5 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$1M

5 items

2026

$100K

1 items

2027

$300K

1 items

2028

$700K

1 items

By department

Line items and planning budgets by department, Berlin.
DepartmentLine itemsBudgetShare
Wastewater2$411K16%
Sewer6$2M84%

Wastewater treatment plants in Berlin

1 publicly owned treatment plant in Berlin with 5 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Berlin Pollution Control Facility1.12NH01000135

Other New Hampshire cities with capital plans

Berlin capital plan questions

Sources and methodology

Budgets and years are as published in Berlin’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2023–2028 (8 line items).

Data refreshed September 11, 2026.