7 line items · $6M · starting 2027–2031 · 1 plan
Hooksett's published capital plans list 7 water, sewer and wastewater line items with a combined planning budget of $6M, of which 7 items worth $6M sit in the wastewater and sewer departments. The largest single item is Martins Ferry Force Main Upgrades at $2M (2028–2029). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Martins Ferry Force Main Upgrades | Wastewater | Force mains and interceptors | $2M | 2028–2029 |
| 2 | Aeration Blower Upgrade | Wastewater | Aeration and blowers | $1M | 2030–2031 |
| 3 | K-Mart Pump Station Upgrades | Sewer | Pump stations | $1M | 2031–2032 |
| 4 | Aeration Media Replacement | Wastewater | Aeration and blowers | $750K | 2031–2032 |
| 5 | Wastewater Plant Roof Replacement | Wastewater | Wastewater treatment plant upgrades | $200K | 2027–2028 |
| 6 | Pick-up Truck Replacement 1 Ton | Wastewater | Vehicles and equipment | $95K | 2030–2031 |
| 7 | Pick-up Truck Replacement 3/4 Ton | Wastewater | Vehicles and equipment | $70K | 2030–2031 |
Descriptions, page references and contacts for Hooksett
Klarifi holds every Hooksett line item with its description, the page it appears on and the source document. Track new plans as they are adopted and compare with similar projects in other cities.
2027
$200K
1 items
2028
$2M
1 items
2030
$1M
3 items
2031
$2M
2 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 6 | $5M | 78% |
| Sewer | 1 | $1M | 22% |
1 publicly owned treatment plant in Hooksett with 1 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Hooksett Wastewater Treatment Facility | 0.68 | NH0100129 | 1 |
Sources and methodology
Budgets and years are as published in Hooksett’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2027–2032 (7 line items).
Data refreshed September 11, 2026.