Milford, New Hampshire: water and wastewater capital improvement projects

3 line items · $2M · starting 2027–2029 · 1 plan

Milford's published capital plans list 3 water, sewer and wastewater line items with a combined planning budget of $2M, of which 1 items worth $435K sit in the wastewater and sewer departments. The largest single item is North End Asbestos Cement (AC) Main Replacement at $1M (2027–2031). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Milford

The 3 largest water, sewer and wastewater line items in Milford’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1North End Asbestos Cement (AC) Main ReplacementWater DistributionWater mains and distribution$1M2027–2031
2WWTF Secure Sludge Landfill RemediationWastewaterBiosolids, sludge and dewatering$435K2029–2031
3Brookview Booster Pump StationWater DistributionPump stations$290K2028–2031

Descriptions, page references and contacts for Milford

Klarifi holds every Milford line item with its description, the page it appears on and the source document, plus 4 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

2027

$1M

1 items

2028

$290K

1 items

2029

$435K

1 items

By department

Line items and planning budgets by department, Milford.
DepartmentLine itemsBudgetShare
Wastewater1$435K22%
Water Distribution2$2M78%

Wastewater treatment plants in Milford

1 publicly owned treatment plant in Milford with 191 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Milford Wastewater Treatment Facility0.78NH0100471191

Other New Hampshire cities with capital plans

Milford capital plan questions

Sources and methodology

Budgets and years are as published in Milford’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2025–2030 (3 line items).

Data refreshed September 11, 2026.