Minot's published capital plans list 13 water, sewer and wastewater line items with a combined planning budget of $141M, of which 13 items worth $141M sit in the wastewater and sewer departments. The largest single item is Wastewater Treatment Facility at $95M (2029). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Minot

The 10 largest water, sewer and wastewater line items in Minot’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1Wastewater Treatment FacilityWastewaterWastewater treatment plant upgrades$95M2029
211th Ave NW & Lincoln Ave Watermain ReplacementSewerWater mains and distribution$7M2025
3Puppydog VII - Lift Station ImprovementsSewerLift stations$6M2029
4SE Area Utility RehabilitationSewer$5M2028–2029
5Eastwood Park Watermain ReplacementSewerWater mains and distribution$5M2027–2028
6Area West of NDSF Watermain ReplacementSewerWater mains and distribution$4M2028–2029
7BelAir Area Watermain ReplacementSewerWater mains and distribution$4M2027–2028
8South Hill Complex Area Watermain ReplacementSewerWater mains and distribution$4M2026–2027
9Edison Area Watermain ReplacementSewerWater mains and distribution$4M2026–2027
102nd Ave SW (16th St SW-30th St SW) Watermain ReplacementSewerWater mains and distribution$4M2025–2026

3 more line items in Minot, with descriptions and contacts

Klarifi holds every Minot line item with its description, the page it appears on and the source document. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$14M

3 items

2026

$7M

2 items

2027

$9M

2 items

2028

$9M

2 items

2029

$102M

4 items

By department

Line items and planning budgets by department, Minot.
DepartmentLine itemsBudgetShare
Wastewater1$95M67%
Sewer12$47M33%

Wastewater treatment plants in Minot

1 publicly owned treatment plant in Minot with 19 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
City Of Minot - Minot Landfill4.26ND002289619

Minot capital plan questions

Sources and methodology

Budgets and years are as published in Minot’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2025–2029 (13 line items).

Data refreshed September 11, 2026.