4 line items · $137M · starting 2026 · 1 plan
Ogden's published capital plans list 4 water, sewer and wastewater line items with a combined planning budget of $137M, of which 1 items worth $18M sit in the wastewater and sewer departments. The largest single item is 36" Canyon Waterline Replacement at $87M (2025). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | 36" Canyon Waterline Replacement | Water Distribution | Water mains and distribution | $87M | 2025 |
| 2 | Distribution, Fire Flow, & Pressure Improvements | Water Distribution | Water mains and distribution | $29M | 2025–2029 |
| 3 | Sanitary Sewer Master Plan Projects | Sewer | Sewer rehabilitation and I&I | $18M | 2025–2029 |
| 4 | Pineview Wellfield | Water Distribution | Wells and groundwater | $3M | 2026–2027 |
Descriptions, page references and contacts for Ogden
Klarifi holds every Ogden line item with its description, the page it appears on and the source document, plus 1 verified contact at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$133M
3 items
2026
$3M
1 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Sewer | 1 | $18M | 13% |
| Water Distribution | 3 | $119M | 87% |
2 publicly owned treatment plants in Ogden with 4 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Central Weber Sewer Improvement District | — | UT0021911 | 4 |
| Little Mountain Service Area | — | UT0025569 | 0 |
Sources and methodology
Budgets and years are as published in Ogden’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2025–2029 (4 line items).
Data refreshed September 11, 2026.