Klarifi Logo
Try for freeLog in
Klarifi Logo

Ledyard Water Pollution Control Facility

Ledyard, CT · New London County · Publicly Owned Treatment Works

Average flow
0.08 MGD
Design flow
0.26 MGD
NPDES permit
CT0101681
Expired
Permit expires
June 2025
Population served
1,509
CWNS 2022

Ledyard Water Pollution Control Facility is a publicly owned wastewater treatment works in Ledyard, New London County, Connecticut treating an average of 0.08 million gallons per day against a permitted design capacity of 0.26 MGD, serving about 1,509 residents. Treatment on site includes uncovered lagoons. It discharges under NPDES permit CT0101681 (expired), which expires in June 2025, with 4 recorded violations in the last three years.

Treatment technology

Treatment structures identified at this facility. Exact unit counts are available in Klarifi.

Uncovered lagoons

Unlock

Unlock exact unit counts →

Compliance snapshot (last 3 years)

Total violations
4
Effluent violations
4

Based on NPDES Discharge Monitoring Reports. Full violation history, parameters and discharge data available in the Klarifi platform.

Key contacts

1 verified contact for Ledyard Water Pollution Control Facility, with validated emails and direct phone numbers.

Unlock 1 verified contact

Names, validated emails and direct phone numbers for decision-makers at Ledyard Water Pollution Control Facility, plus the full compliance history and discharge data.

Try Klarifi free

Nearby wastewater treatment plants in Connecticut

Mystic WPCF

Mystic · 6 mi away

0.42 MGD

Stonington Borough WPCF

Stonington · 7 mi away

0.21 MGD

Montville Water Pollution Control Facility

Montville (uncasville) · 7 mi away

0.75 MGD

4.66 MGD

0.07 MGD

0.27 MGD

Willimantic WPCF

Willimantic · 23 mi away

1.31 MGD

Ledyard Water Pollution Control Facility: frequently asked questions

Sources and methodology

Flow, permit and violation figures come from the EPA's ICIS-NPDES discharge monitoring records. Population served comes from the Clean Watersheds Needs Survey 2022. Treatment structures are identified by Klarifi's review of aerial imagery, and capital improvement projects are extracted from published municipal budget documents. Violations are counted over the last three years of monitoring reports.

Data refreshed September 11, 2026; facility record last updated December 15, 2025.


Try Klarifi for free

Create your own trial account and explore how Klarifi can help you.

Try for free