Klarifi Logo
Try for freeLog in
Klarifi Logo

Anaerobic digesters and biogas: wastewater treatment plants in Connecticut

23 plants · 43% of the state · 72 MGD combined

Klarifi identifies 23 publicly owned wastewater treatment plants with anaerobic digesters and biogas in Connecticut, 43% of the 54 plants in the state (72 MGD combined). The largest is Stamford Water Pollution Control Facility in Stamford at 12.5 MGD.

Anaerobic digesters stabilise sludge in sealed heated tanks and produce biogas, visible from the air as digester silos and gas holders. Plants with digesters are typically above 5 MGD and are the buyers of mixing, heating, gas handling, cogeneration and dewatering equipment.

Anaerobic digesters and biogas plants nationwide →All plants in ConnecticutLargest plants in Connecticut

The largest plants with anaerobic digesters in Connecticut

The 23 largest plants with anaerobic digesters and biogas in Connecticut by average flow, with permit expiry and three-year violation count.
#FacilityCityAvg flow (MGD)NPDES permitExpiresViolations (3y)
1Stamford Water Pollution Control FacilityStamford12.5CT0101087Dec 20238
2Danbury Water Pollution Control FacilityDanbury7.8CT0100145Jun 20265
3Meriden Water Pollution Control FacilityMeriden6.49CT0100315Dec 202310
4Greenwich WPCFGreenwich5.4CT0100234Jul 20245
5Piacenti Wastewater Treatment PlantNew London4.66CT0100382Apr 20278
6Milford - Housatonic WPCFMilford4.5CT0101656Oct 202431
7Eastside Water Pollution Control FacilityBridgeport4.1CT0101010Apr 202637
8Southington WPCFSouthington (plantsville)3.67CT0100536Sep 20233
9Enfield Water Pollution Control FacilityEnfield3.01CT0100200Jul 20240
10Killingly Water Pollution Control Fac.Danielson2.95CT0101257Dec 20221
11Branford Water Pollution Control FacilityBranford2.9CT0100048Jan 20250
12South Windsor Water Pollution Control FacilitySouth Windsor2.01CT0100510May 20305
13Chesire,water Pollution Control FacilityCheshire1.85CT0100081Sep 202213
14Shelton Water Pollution Control FacilityShelton1.6CT0100714Dec 2025125
15Simsbury Water Pollution Control FacilitySimsbury1.58CT0100919Feb 20242
16University Of Ct Water Pollution Control FacilityStorrs1.5CT0101320May 20234
17Westport WPCFWestport1.46CT0100684Jul 20240
18Willimantic WPCFWillimantic1.31CT0101001Oct 20230
19East Hampton Water Pollution Control FacilityEast Hampton1.04CT0024694Sep 202513
20Thomaston WPCFThomaston0.7CT0100781Jun 20221
21Canton WPCFCanton0.49CT0100072Apr 20272
22Mystic WPCFMystic0.42CT0100544Aug 20228
23Litchfield WPCFBantam0.27CT0100803Jun 202121

Contacts and project signals for every plant on this list

Klarifi adds verified decision-maker contacts, permit limits, discharge monitoring data and the capital projects planned in each city, filterable by technology, size and compliance record.

Start a free trialKlarifi Plus: done-for-you outreach for this segment →

Other technologies in Connecticut

Anaerobic digesters and biogas in Connecticut: questions

Sources and methodology

Flow, permit and violation figures come from the EPA's ICIS-NPDES discharge monitoring records. Population served comes from the Clean Watersheds Needs Survey 2022. Treatment structures are identified by Klarifi's review of aerial imagery, and capital improvement projects are extracted from published municipal budget documents. Violations are counted over the last three years of monitoring reports.

Data refreshed September 11, 2026.

Try Klarifi for free

Create your own trial account and explore how Klarifi can help you.

Try for free