300 Anthony Street, Schenectady, NY 12308 · Schenectady County · Publicly Owned Treatment Works
Schenectady (c) STP is a publicly owned wastewater treatment works in Schenectady, Schenectady County, New York treating an average of 13.23 million gallons per day against a permitted design capacity of 18.5 MGD, serving about 86,767 residents. It discharges under NPDES permit NY0020516 (administratively continued), which expires in December 2025, with 4 recorded violations in the last three years. EPA has recorded 2 formal enforcement actions naming the plant, the latest in May 2009.
3 treatment structures and unit processes identified at Schenectady (c) STP.
Available with a free Klarifi account
See the full treatment train at Schenectady (c) STP: structures, unit processes and planned upgrades, with exact unit counts.
Based on NPDES Discharge Monitoring Reports. Full violation history, parameters and discharge data available in the Klarifi platform.
Federal civil enforcement cases, compliance inspections and informal actions recorded for Schenectady (c) STP in EPA's ICIS system.
Latest case · May 2009
City of Schenectady Water Pollution Control Facility
Administrative order · CWA, Sewage Sludge Disposal · Unilateral Administrative Order Without Adjudication · Compliance actions $500
EPA's description of the case:
“The City of Schenectady WPCF failed to analyze the compost for salmonella within 24 hours from the time of collection for 7 samples collected.”
Source: EPA ECHO, civil enforcement case 02-2009-3066.
Full case history with a free Klarifi account
Every action against Schenectady (c) STP with dates, milestones, violation types and EPA's complete case summaries, plus inspections and informal actions.
Schenectady's capital improvement plan lists 9 water, sewer and wastewater line items worth $6M starting 2025–2025. The largest budgeted items are shown here.
All water and sewer capital projects in Schenectady →
| Project | Budget | Years |
|---|---|---|
| WWTP Digester 4 Upgrades | $3,250,000 | 2025–2025 |
| Water Infrastructure | $1,000,000 | 2025–2025 |
| Sewer Collection System Repairs and Improvements | $500,000 | 2025–2025 |
| WWTP Equipment Replacement | $375,000 | 2025–2025 |
| Water Distribution System Repairs and Improvements | $350,000 | 2025–2025 |
Full project details — scope, funding source, engineering consultant and the decision-makers behind each project — are available in Klarifi, along with similar wastewater capital projects in other cities.
5 verified contacts for Schenectady (c) STP, with validated emails and direct phone numbers.
Unlock 5 verified contacts (2 more than shown)
Names, validated emails and direct phone numbers for decision-makers at Schenectady (c) STP, plus the full compliance history and discharge data.
Clifton Park · 2 mi away
0.0095 MGD
Niskayuna · 4 mi away
1.95 MGD
Schenectady · 4 mi away
0.9 MGD
Altamont · 10 mi away
0.34 MGD
Guilderland · 11 mi away
—
Guilderland · 11 mi away
0.15 MGD
Duanesburg · 12 mi away
0.04 MGD
Waterford · 12 mi away
0.87 MGD
Sources and methodology
Flow, permit and violation figures come from the EPA's ICIS-NPDES discharge monitoring records. Population served comes from the Clean Watersheds Needs Survey 2022. Treatment structures are identified by Klarifi's review of aerial imagery, and capital improvement projects are extracted from published municipal budget documents. Violations are counted over the last three years of monitoring reports.
Data refreshed October 26, 2026; facility record last updated April 5, 2025.
Wastewater terms: POTW · MGD · NPDES permit · Inflow and infiltration · Tertiary treatment · Significant industrial user · all terms