Coal mines in Alabama
NPDES permits, effluent violations and renewals, from EPA’s permit database
- Individual permits in force
- 75
- Major dischargers
- 2
- With effluent violations, 3 years
- 8
EPA’s permit database lists 75 individual NPDES permits for coal mines in Alabama, 2 of them major dischargers. 8 reported at least one effluent violation, a monitored value above a permit limit, in the last three years: 136 violations in all. Coal mines discharge pumped mine water, drainage from spoil and refuse areas and runoff from sediment ponds, which can be acidic and carry iron, manganese, aluminum and dissolved solids, and in parts of Appalachia selenium.
Coal mines with the most violations
Ranked by effluent violations in discharge monitoring reports over the last three years, then by violations of any kind.
| # | Facility | Class | NPDES permit | Status | Expires | Effluent violations (3y) | All violations |
|---|---|---|---|---|---|---|---|
| 1 | Concord Preparation Plant · Hueytown | Minor | AL0003620 | Administratively continued | Sep 2020 | 57 | 57 |
| 2 | Swann'S Crossing · Brookwood | Minor | AL0080578 | Effective | Mar 2029 | 43 | 43 |
| 3 | Bessie Mine · Adamsville | Minor | AL0003263 | Effective | Jul 2031 | 20 | 20 |
A violation here is a result in a discharge monitoring report that EPA’s system flags against the permit: an effluent violation is a measured value above a limit; all violations also count late or missing reports. One facility can record several in a month, one per pollutant and limit. Major permits are those EPA rates highest for toxic load, flow and the receiving water.
Pollutants behind the violations
Effluent violations at coal mines in Alabama over the last three years, by the parameter whose limit was exceeded.
| Parameter | Effluent violations | Permits |
|---|---|---|
| Solids, total dissolved [TDS] | 42 | 1 |
| Nitrogen, ammonia total [as N] | 23 | 2 |
| Selenium, total recoverable | 20 | 2 |
| Solids, total suspended (TSS) | 15 | 5 |
| pH | 6 | 3 |
| E. coli | 6 | 2 |
| Iron, total [as Fe] | 5 | 2 |
| Cadmium, dissolved [as Cd] | 5 | 1 |
| Thallium, dissolved [as Tl] | 5 | 1 |
| Arsenic, trivalent dissolved | 3 | 1 |
Permits: how many of the 75 exceeded a limit for the parameter at least once. Limits for the same pollutant differ from permit to permit, so the counts compare how often limits were broken, not how much was discharged.
Permit renewals
When the individual permits of coal mines in Alabama expire.
46 permits are past the expiry date in EPA’s record and still in force, administratively continued while the renewal is pending, and 24 permits expire by the end of 2030. An NPDES permit runs for five years. To keep discharging, a facility must apply for renewal at least 180 days before the expiry date, and the renewed permit often brings tighter effluent limits, new monitoring or a compliance schedule: the point at which a facility budgets for treatment upgrades.
| Expires | Permits |
|---|---|
| Past the expiry date | 46 |
| 2027 | 13 |
| 2028 | 3 |
| 2029 | 6 |
| 2030 | 2 |
Where they discharge
The counties with the most coal mine permits in Alabama.
| County | Permits | Major |
|---|---|---|
| Tuscaloosa | 21 | 1 |
| Walker | 18 | 0 |
| Jefferson | 17 | 1 |
| Shelby | 5 | 0 |
| Jackson | 4 | 0 |
| Bibb | 2 | 0 |
| Cullman | 2 | 0 |
| Barbour | 1 | 0 |
| DeKalb | 1 | 0 |
| Fayette | 1 | 0 |
Each permit names the river, creek, bay or ditch its outfalls discharge to; Klarifi shows them with the permit.
Federal effluent guidelines
The technology-based limits EPA sets for the industry nationally, which every coal mine permit in Alabama starts from.
- 40 CFR Part 434 · Coal Mining Point Source Category
Part 434 limits iron, manganese, total suspended solids and pH in acid or ferruginous mine drainage, with alternate limits for settleable solids during storms and separate provisions for post-mining areas, coal preparation plants and remining. Permits add water-quality-based limits where the receiving stream needs them, for example for selenium or aluminum, and an outfall usually stays permitted until the site is reclaimed and its bond released. The same part sets pretreatment standards for coal mines that send their wastewater to a municipal treatment plant instead of a river.
What they make
The industry codes EPA records for the coal mines in Alabama.
| Industry | Permits |
|---|---|
| Surface Coal Mining | 70 |
| Coal Mining | 3 |
| Underground Coal Mining | 2 |
Coal mines in Alabama: questions
How many coal mines in Alabama have NPDES permits?
EPA's permit database lists 75 individual NPDES permits in force (effective or administratively continued) for coal mines in Alabama, 2 of them major dischargers. A facility needs one to discharge wastewater or process water to a river, lake or the sea; facilities that send their wastewater to a municipal plant are covered by pretreatment rules instead.
Which coal mine in Alabama has the most effluent violations?
Concord Preparation Plant in Hueytown (NPDES permit AL0003620) recorded the most: 57 monitoring results above a permit limit in the last three years. 8 of the 75 coal mine permits in Alabama recorded at least one.
Which pollutants do coal mines in Alabama exceed most often?
Over the last three years, the limits exceeded most often were for these parameters: Solids, total dissolved [TDS] (42 violations at 1 permit), Nitrogen, ammonia total [as N] (23 violations at 2 permits), Selenium, total recoverable (20 violations at 2 permits).
Which effluent guidelines apply to coal mines?
40 CFR Part 434 (Coal Mining Point Source Category). Part 434 limits iron, manganese, total suspended solids and pH in acid or ferruginous mine drainage, with alternate limits for settleable solids during storms and separate provisions for post-mining areas, coal preparation plants and remining. Permits add water-quality-based limits where the receiving stream needs them, for example for selenium or aluminum, and an outfall usually stays permitted until the site is reclaimed and its bond released.
When do coal mine permits in Alabama come up for renewal?
46 permits are past the expiry date in EPA's record and still listed in force. 13 permits expire in 2027. An NPDES permit runs for five years, and the application for renewal is due 180 days before it expires.
Other industries in Alabama
- 15
Coal mines in other states
- 1,050
Try Klarifi for free
Create your own trial account and explore how Klarifi can help you.