Log inTry for free

Coal mine drainage

How acid mine drainage is treated, and the NPDES permits and violations of coal mines across the US

Individual permits in force
1,877
Major dischargers
22
With effluent violations, 3 years
528

When pyrite in coal seams and spoil meets air and water it oxidizes to sulfuric acid and dissolved iron: acid mine drainage, often stained orange, carrying manganese, aluminum and sulfate. Where the rock holds enough limestone the drainage is alkaline but still high in iron and dissolved solids, and in parts of central Appalachia selenium leaches from the overburden.

The drainage does not stop when mining does. A permit’s outfalls, its sediment ponds and treatment systems, stay regulated until the site is reclaimed and the bond released, which can take decades. Many abandoned mines discharge with no permit at all, treated, if at all, by state reclamation programs.

How coal mine drainage is treated

The usual treatment train at coal mines, from the drain to the outfall or the sewer.

  1. 01
    Collection and sediment ponds
    Runoff and pumped mine water are collected and settled; most outfalls on a coal mine permit are pond discharges.
  2. 02
    Neutralization
    Lime, hydrated lime, caustic soda or ammonia raises the pH so the metals come out of solution.
  3. 03
    Aeration and settling
    Aeration oxidizes dissolved iron; ponds or clarifiers settle the iron, aluminum and manganese hydroxide sludge.
  4. 04
    Passive treatment
    Anoxic limestone drains, vertical flow ponds and constructed wetlands treat smaller or older discharges with little or no chemical.
  5. 05
    Selenium and dissolved solids
    Biological reactors, zero-valent iron or reverse osmosis where a permit limits selenium or conductivity.

Coal mines by state

Individual NPDES permits in force held by coal mines, by state.

EPA’s permit database lists 1,877 individual NPDES permits in force for coal mines in 24 states, 22 of them major dischargers. 528 reported at least one effluent violation in the last three years: 6,363 violations in all.

StatePermitsMajorWith effluent violations
West Virginia1,0501329
Pennsylvania256032
Virginia192250
Kentucky80027
Alabama7528
Illinois50023
Indiana35013
Ohio2407
Tennessee2107
Colorado19511
Wyoming1503
Texas1234
Utah1225
Montana833
New Mexico600

The 15 states with the most permits. Source: EPA ICIS-NPDES permits and discharge monitoring reports, via Klarifi, Oct 2026.

Coal mines with the most violations

Ranked by effluent violations in discharge monitoring reports over the last three years, then by violations of any kind.

#FacilityStateClassNPDES permitStatusEffluent violations (3y)All violations
1Hobet Mining Llc · DanvilleWest VirginiaMinorWV0099392Effective316316
2Westridge Mine · MadisonWest VirginiaMinorWV1016776Effective208208
3Peach Orchard Surface Mine No. 5 · BickmoreWest VirginiaMinorWV1017969Effective192192
Unlock all 1,877 coal mine permits
See the other 1,874 permits, searchable by state, name, permit number and product, with permit status, expiry, limits and violation history. Free with a Klarifi account.
Or let Klarifi Plus run the outreach for you
Create a free account
The 3 coal mines in the US with the most effluent violations in the last three years, among individual NPDES permits in force (effective or administratively continued). Source: EPA ICIS-NPDES permits and discharge monitoring reports, via Klarifi, Oct 2026.

Pollutants behind the violations

Effluent violations at coal mines across the US over the last three years, by the parameter whose limit was exceeded.

ParameterEffluent violationsPermits
Aluminum, total [as Al]1,753201
Selenium, total recoverable1,28766
Iron, total [as Fe]1,059188
Solids, total suspended (TSS)604192
Manganese, total [as Mn]53078
pH428106
Toxicity [chronic], Ceriodaphnia dubia12122
Iron, total recoverable9318
Selenium, dry weight5024
Solids, total dissolved [TDS]432

What they make

The industry codes EPA records for the coal mines with permits.

IndustryPermits
Surface Coal Mining1,623
Underground Coal Mining206
Coal Mining48

Federal effluent guidelines

The technology-based limits EPA sets nationally, which every permit starts from.

  • 40 CFR Part 434 · Coal Mining Point Source Category

Part 434 limits iron, manganese, total suspended solids and pH in acid or ferruginous mine drainage, with alternate limits for settleable solids during storms and separate provisions for post-mining areas, coal preparation plants and remining. Permits add water-quality-based limits where the receiving stream needs them, for example for selenium or aluminum, and an outfall usually stays permitted until the site is reclaimed and its bond released. The same parts set pretreatment standards for plants that discharge to a municipal sewer, on top of the city’s local limits.

Coal mine drainage: questions

  1. How is coal mine drainage treated?

    Actively, with chemicals: lime, caustic soda or ammonia raises the pH so iron, aluminum and manganese precipitate, aeration oxidizes the iron, and ponds or clarifiers settle the metal sludge. Smaller and older discharges are often treated passively, through limestone drains, vertical flow ponds and constructed wetlands, and selenium needs biological or other advanced treatment.

  2. How many coal mines have NPDES permits?

    EPA's permit database lists 1,877 individual NPDES permits in force for coal mines in 24 states, 22 of them major dischargers. West Virginia has the most (1,050).

  3. Which coal mine has the most effluent violations?

    Hobet Mining Llc in Danville, West Virginia (NPDES permit WV0099392) recorded the most: 316 monitoring results above a permit limit in the last three years.

  4. Which limits do coal mines exceed most often?

    Over the last three years: Aluminum, total [as Al] (1,753 violations at 201 permits), Selenium, total recoverable (1,287 violations at 66 permits), Iron, total [as Fe] (1,059 violations at 188 permits).

  5. Which effluent guidelines apply to coal mines?

    40 CFR Part 434 (Coal Mining Point Source Category). Part 434 limits iron, manganese, total suspended solids and pH in acid or ferruginous mine drainage, with alternate limits for settleable solids during storms and separate provisions for post-mining areas, coal preparation plants and remining. Permits add water-quality-based limits where the receiving stream needs them, for example for selenium or aluminum, and an outfall usually stays permitted until the site is reclaimed and its bond released.

Coal mines by state

  • Coal mines in Alabama
    75
  • 1,050

Try Klarifi for free

Create your own trial account and explore how Klarifi can help you.

Try for freeOr book a demo
Wastewater market intelligence: facilities, permits, compliance and capital projects for North America and Europe.
© 2026 Klarifi ApS, Diplomvej 381, 2800 Kgs. Lyngby, Denmark
Public data refreshed Oct 29, 2026