Log inTry for free

Paper mills in Maine

NPDES permits, effluent violations and renewals, from EPA’s permit database

Individual permits in force
10
Major dischargers
7
With effluent violations, 3 years
4

EPA’s permit database lists 10 individual NPDES permits for paper mills in Maine, 7 of them major dischargers. 4 reported at least one effluent violation, a monitored value above a permit limit, in the last three years: 21 violations in all. Pulp and paper mills are among the largest industrial users of water: they discharge treated process water from pulping, bleaching and papermaking, high in BOD, solids and color, usually after primary clarification and an aerated lagoon or activated sludge system.

Paper mills with the most violations

Ranked by effluent violations in discharge monitoring reports over the last three years, then by violations of any kind.

#FacilityClassNPDES permitStatusExpiresEffluent violations (3y)All violations
1Nd Paper Inc - Rumford Division · RumfordMajorME0002054EffectiveJul 2031711
2Sappi North America, Inc. - Somerset Operations · SkowheganMajorME0021521Administratively continuedDec 202066
3Woodland Pulp Mill · BaileyvilleMinorME0001872Administratively continuedJun 2019538
Unlock all 10 paper mill permits in Maine
See the other 7 permits, searchable by name, permit number and county, with permit status, expiry, limits and violation history. Free with a Klarifi account.
Create a free account
The 3 paper mills in Maine with the most effluent violations in the last three years, among individual NPDES permits in force (effective or administratively continued). Source: EPA ICIS-NPDES permits and discharge monitoring reports, via Klarifi, Oct 2026.

A violation here is a result in a discharge monitoring report that EPA’s system flags against the permit: an effluent violation is a measured value above a limit; all violations also count late or missing reports. One facility can record several in a month, one per pollutant and limit. Major permits are those EPA rates highest for toxic load, flow and the receiving water.

Pollutants behind the violations

Effluent violations at paper mills in Maine over the last three years, by the parameter whose limit was exceeded.

ParameterEffluent violationsPermits
Solids, total suspended (TSS)63
BOD, 5-day, 20 deg. C53
Temp. difference, summer [deg. F]31
pH22
Zinc, total [as Zn]21
Cadmium, total [as Cd]11
Color11
Temperature, water deg. fahrenheit11

Permits: how many of the 10 exceeded a limit for the parameter at least once. Limits for the same pollutant differ from permit to permit, so the counts compare how often limits were broken, not how much was discharged.

Permit renewals

When the individual permits of paper mills in Maine expire.

7 permits are past the expiry date in EPA’s record and still in force, administratively continued while the renewal is pending, and 1 permit expires by the end of 2028. An NPDES permit runs for five years. To keep discharging, a facility must apply for renewal at least 180 days before the expiry date, and the renewed permit often brings tighter effluent limits, new monitoring or a compliance schedule: the point at which a facility budgets for treatment upgrades.

ExpiresPermits
Past the expiry date7
20281

Where they discharge

The counties with the most paper mill permits in Maine.

CountyPermitsMajor
Penobscot32
Washington20
Aroostook11
Cumberland11
Franklin11
Oxford11
Somerset11

Each permit names the river, creek, bay or ditch its outfalls discharge to; Klarifi shows them with the permit.

Federal effluent guidelines

The technology-based limits EPA sets for the industry nationally, which every paper mill permit in Maine starts from.

  • 40 CFR Part 430 · Pulp, Paper and Paperboard Point Source Category

Part 430 limits BOD, total suspended solids and pH by mill type and production. Since the 1998 Cluster Rule, mills that bleach kraft or soda pulp with chlorine compounds also face limits at the bleach plant for dioxin (2,3,7,8-TCDD), furan (TCDF), chloroform and chlorinated phenolics, and on AOX at the final outfall. The same part sets pretreatment standards for paper mills that send their wastewater to a municipal treatment plant instead of a river.

What they make

The industry codes EPA records for the paper mills in Maine.

IndustryPermits
Paper Mills8
Pulp Mills1
Pulp, Paper, and Paperboard Mills1

Paper mills in Maine: questions

  1. How many paper mills in Maine have NPDES permits?

    EPA's permit database lists 10 individual NPDES permits in force (effective or administratively continued) for paper mills in Maine, 7 of them major dischargers. A facility needs one to discharge wastewater or process water to a river, lake or the sea; facilities that send their wastewater to a municipal plant are covered by pretreatment rules instead.

  2. Which paper mill in Maine has the most effluent violations?

    Nd Paper Inc - Rumford Division in Rumford (NPDES permit ME0002054) recorded the most: 7 monitoring results above a permit limit in the last three years. 4 of the 10 paper mill permits in Maine recorded at least one.

  3. Which pollutants do paper mills in Maine exceed most often?

    Over the last three years, the limits exceeded most often were for these parameters: Solids, total suspended (TSS) (6 violations at 3 permits), BOD, 5-day, 20 deg. C (5 violations at 3 permits), Temp. difference, summer [deg. F] (3 violations at 1 permit).

  4. Which effluent guidelines apply to paper mills?

    40 CFR Part 430 (Pulp, Paper and Paperboard Point Source Category). Part 430 limits BOD, total suspended solids and pH by mill type and production. Since the 1998 Cluster Rule, mills that bleach kraft or soda pulp with chlorine compounds also face limits at the bleach plant for dioxin (2,3,7,8-TCDD), furan (TCDF), chloroform and chlorinated phenolics, and on AOX at the final outfall.

  5. When do paper mill permits in Maine come up for renewal?

    7 permits are past the expiry date in EPA's record and still listed in force. 1 permit expires in 2028. An NPDES permit runs for five years, and the application for renewal is due 180 days before it expires.

Paper mills in other states

  • Paper mills in Alabama
    15

Try Klarifi for free

Create your own trial account and explore how Klarifi can help you.

Try for freeOr book a demo
Wastewater market intelligence: facilities, permits, compliance and capital projects for North America and Europe.
© 2026 Klarifi ApS, Diplomvej 381, 2800 Kgs. Lyngby, Denmark
Public data refreshed Oct 29, 2026