Boone, Iowa: water and wastewater capital improvement projects

23 line items · $33M · starting 2026 · 1 plan

Boone's published capital plans list 23 water, sewer and wastewater line items with a combined planning budget of $33M, of which 13 items worth $21M sit in the wastewater and sewer departments. The largest single item is Aerated Digester Replacement at $6M (2026–2027). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Boone

The 10 largest water, sewer and wastewater line items in Boone’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1Aerated Digester ReplacementWastewaterAnaerobic digesters and biogas$6M2026–2027
2VLR Basin Addition – VerticelWastewater$5M2026–2027
31 MG Elevated Storage TankWater DistributionStorage tanks and reservoirs$4M2026–2027
4Water Plant Well (New)Water SupplyWater treatment plants$4M2026–2029
5Fan PressWastewater$4M2026–2027
6Biosolids ThickeningWastewaterBiosolids, sludge and dewatering$2M2026–2027
7Snedden Drive Lift StationSewerLift stations$2M2026–2027
8Ground Storage ReservoirWater DistributionStorage tanks and reservoirs$1M2026–2027
9Lime Residual Disposal PondWater Supply$1M2026–2030
10High Service Pump ReplacementWater DistributionPump stations$977K2026–2028

13 more line items in Boone, with descriptions and contacts

Klarifi holds every Boone line item with its description, the page it appears on and the source document, plus 1 verified contact at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$500K

2 items

2026

$32M

21 items

By department

Line items and planning budgets by department, Boone.
DepartmentLine itemsBudgetShare
Wastewater11$18M56%
Sewer2$2M7%
Water Supply5$6M17%
Water Distribution5$6M19%

Project types in Boone's plan

Wastewater treatment plants in Boone

1 publicly owned treatment plant in Boone with 3 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
City Of Boone Water Pollution ControlIA00580763

Other Iowa cities with capital plans

Boone capital plan questions

Sources and methodology

Budgets and years are as published in Boone’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2026–2030 (23 line items).

Data refreshed September 11, 2026.