23 line items · $33M · starting 2026 · 1 plan
Boone's published capital plans list 23 water, sewer and wastewater line items with a combined planning budget of $33M, of which 13 items worth $21M sit in the wastewater and sewer departments. The largest single item is Aerated Digester Replacement at $6M (2026–2027). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Aerated Digester Replacement | Wastewater | Anaerobic digesters and biogas | $6M | 2026–2027 |
| 2 | VLR Basin Addition – Verticel | Wastewater | — | $5M | 2026–2027 |
| 3 | 1 MG Elevated Storage Tank | Water Distribution | Storage tanks and reservoirs | $4M | 2026–2027 |
| 4 | Water Plant Well (New) | Water Supply | Water treatment plants | $4M | 2026–2029 |
| 5 | Fan Press | Wastewater | — | $4M | 2026–2027 |
| 6 | Biosolids Thickening | Wastewater | Biosolids, sludge and dewatering | $2M | 2026–2027 |
| 7 | Snedden Drive Lift Station | Sewer | Lift stations | $2M | 2026–2027 |
| 8 | Ground Storage Reservoir | Water Distribution | Storage tanks and reservoirs | $1M | 2026–2027 |
| 9 | Lime Residual Disposal Pond | Water Supply | — | $1M | 2026–2030 |
| 10 | High Service Pump Replacement | Water Distribution | Pump stations | $977K | 2026–2028 |
13 more line items in Boone, with descriptions and contacts
Klarifi holds every Boone line item with its description, the page it appears on and the source document, plus 1 verified contact at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$500K
2 items
2026
$32M
21 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 11 | $18M | 56% |
| Sewer | 2 | $2M | 7% |
| Water Supply | 5 | $6M | 17% |
| Water Distribution | 5 | $6M | 19% |
1 publicly owned treatment plant in Boone with 3 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| City Of Boone Water Pollution Control | — | IA0058076 | 3 |
Sources and methodology
Budgets and years are as published in Boone’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2026–2030 (23 line items).
Data refreshed September 11, 2026.